Remington QFP40 manual Cathedral Ceiling Installation

Page 41

REMINGTON QFP40 Direct Vent FIREPLACE

VERTICAL INSTALLATION INSTRUCTIONS (CONT.)

CATHEDRAL CEILING INSTALLATION

Step 1. Follow installation Steps 1 and 2 under vertical termination section.

Step 2. Using the plumb-bob, mark the centerline of the venting system on the ceiling, and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the cathedral ceiling support box.

Step 3. Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8" (3mm) larger than the support box outline.

Step 4. Lower the support box through the hole in the roof until the bottom of the box protrudes at least 2" (51mm) below the ceiling (Figure 17). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

FIG. 17

Step 5. Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing (Figure 18). Before nailing it to the roof, run a bead of non-hardening mastic around the top edges of the support box to make a seal between it and the roof. Clean out any combustible material from inside the support box.

FIG. 18

Step 6. Complete the cathedral ceiling installation by following the same procedures outlines in steps 4 through 8 for vertical terminations.

250-4721 JUNE 2001

VENTING

Page 41

Image 41
Contents What to do if YOU Smell GAS For Your SafetyCongratulations WelcomeModel Name Serial Number Date Purchased Contents Maintenance Completing InstallationTroubleshooting Parts & Accessories Warranty OperationRatings Plate Safety LabelModel Remington QFP40 Vented GAS Fireplace Heater STANDARDS/CLEARANCES LabelSafety Notices If YOU Smell GAS Safety NoticesHeating Specifications SpecificationsMinimum Cabinet Dimensions Preparation Installation TerminologyPreparation AN Overview Installation to OperationLP Conversion Instructions LP ConversionFIG. B Conversion INSTRUCTIONS,Minimum Framing Dimensions InstallationCorner Installations Raised Fireplace Raised Fireplace with Raised Hearth Hearth Requirements Combustible Mantels Mantel RequirementsAcid Wash Alert Fascia DimensionsInstallation Rectangular Fascia Facing RequirementsFacing Over 1 25mm Thick Safety Precautions for the Installer Installation PrecautionsVenting General Venting InstructionsSimpson DURA-VENT Parts List Vertical Termination Rule Venting Installation Options & Guidelines#HHW2 OnlyInstallation Into a Class a Metal Chimney USA only Venting INSTALLATION,Installation Into a Masonry Chimney USA only HOW to USE Vent Graph Horizontal Termination Requirements Female Locking Lugs Male Locking Lugs Horizontal InstallationWall Siding Beneath Removed Wood ScrewHHW2 Venting Using GS Series Pipe Vertical Installation InstructionsVenting Minimum Clearance Cathedral Ceiling Installation Installation Into a Class a Metal Chimney USA only Installation Into AN Existing Masonry Chimney USA only Venting Venting GAS Line Requirements GAS LineOptional Thermostat Installation Copper White Wire BlackElectrical Electrical ConnectionBrick Installation Brick InstallBrick INSTALLATION, LOG Identification Logset InstallLogset and Nugget Installation Nugget Placement Logset and Nugget INSTALLATION,Left Twig Installing Fascia Installing GlassGlass FasciaInitial START-UP Normal Occurrences Leak TEST/START-UPLeak Test Lighting Instructions LightingShutter Adjustment AdjustmentsDamper Adjustment Adjusting the Blower SpeedHigh Altitude Operation Control Panel OperationOperation Maintenance MaintenanceYearly Servicing Procedures Glass Replacement Blower Replacement Electrical Schematic Troublshooting TroubleshootingTROUBLESHOOTING, Parts Parts & AccessoriesWarranty WarrantyDirect Vent Gas Fireplace