Quadra-Fire VOYAGEUR-MBK Chimney Systems, Venting Systems, Inspections, Larger Chimneys

Page 35

R

VOYAGEUR Wood Insert

8Chimney Systems

A. Venting Systems

Chimney Connector:

It is also known as fl ue pipe or stove pipe. It must be 6 inches (152mm) minimum diameter stainless steel connector pipe.

Chimney:

The chimney can be new or existing, masonry or prefabricated and must meet the following minimum requirements as specifi ed below.

WARNING! Risk of Fire!

Follow venting manufacturer’s clearances and instructions when installing venting system.

B. Inspections

Existing chimneys should be inspected and cleaned by a qualifi ed professional prior to installation. The chimney must not have cracks, loose mortar or other signs of dete- rioration and blockage. Hearth & Home recommends a NFI or CSIA certifi ed professional or a technician, under the direction of a certifi ed professional, conduct a Level II inspection per NFPA 211.

WARNING

Fire Risk

Inspection of Chimney:

Chimney must be in good condition.

Meets minimum standard of NFPA 211

Factory-built chimney must be 6 inch (152mm) UL103 HT.

C.Larger Chimneys

Hearth & Home recommends that chimneys with larger diameters than 6 inches (152mm) be fully relined. An over- sized fl ue can affect draft and impair performance and will allow increased build-up of creosote which is why a full reline is stongly recommended.

NOTICE: Check with your local building authorities and/or consult the National Fire Protection Association (NFPA 211).

D. Masonry Chimney

Must meet minimum standards of NFPA 211.

Must have at least 5/8 inch (16mm) fi reclay lining joined with refractory cement.

NOTE: Installations into a clay flue without a stainless steel liner may reduce draw which affects performance, will cause the glass to darken and produce excessive creosote and create start-up issues.

The masonry wall of the chimney, if brick or modular block, must be a minimum of 4 inches (102mm) nominal thickness.

A chimney of rubble stone must be at least 12 inches (305mm) thick.

Cross-sectional area shall conform to NFPA 211-2006 Section 12.4.5.1.

Should be lined with a 6 inch (152mm) stainless steel fl ue liner to improve performance and reduce creosote build-up and diffi culty starting a fi re.

An equivalent liner must be a listed chimney liner system or other approved material.

No dilution air is allowed to enter the chimney.

1.Secure the fi replace damper in the open position. If this cannot be accomplished, it will be necessary to remove the damper

2.Seal damper area of chimney around chimney connector with a high temperature sealant or seal insert against the face of the fi replace.

3.Both methods must be removable and replaceable for cleaning and re-installation.

When possible, install an airtight clean-out door to the rear of the smoke shelf.

NOTE: Masonry chimneys are signifi cantly less than ideal for venting solid fuel appliances. A masonry chimney is not subject to any temperature limit test, therefore a full reline is strongly recommended.

November 22, 2011

7063-173D

Page 35

Image 35
Contents Hot glass will cause burns Voyageur Wood InsertMfg Date Voyageur Wood InsertSerial Number Model NameTable of Contents Voyageur Wood Insert Warranty Policy Voyageur Wood Insert Mobile Home Approved Listing and Code ApprovalsAppliance Certifi cation BTU & Effi ciency Specifi cationsYour Wood Appliance Operating InstructionsSeasoned Wood Voyageur Wood Insert Fire SafetyOverfi ring Combustible/Non-combustible MaterialsFinal Stage Kindling or First Stage Voyageur Wood Insert Burning ProcessSecond Stage Start-Up Air Control Manual Timer Over-RideVoyageur Wood Insert Automatic Combustion Control ACC Air ControlsVoyageur Wood Insert Burn Rates and Operating Effi ciency Correct Baffl e and Blanket Positions Voyageur Wood Insert Correct Baffl e & Blanket PlacementFuel Reloading Instructions Voyageur Wood Insert Building a FireHardwood vs Softwood Moisture Voyageur Wood Insert Wood FuelBlower Operating Instructions Opacity Smoke Frequently Asked QuestionsVoyageur Wood Insert Clear Space Your specifi c model Voyageur Wood Insert Quick Start GuideDisposal of Ashes Maintenance and ServiceChimney and Chimney Connector Inspection/Cleaning Cleaning Plated SurfacesInspect Firebrick & Replacement Instructions Voyageur Wood Insert Glass CleaningMonthly Voyageur Wood Insert Quick Reference Maintenance GuideStart Fire Problems Possible Cause Solution Troubleshooting GuideWiring Diagram Service Parts ReplacementGlass Replacement Snap Disc Replacement ContdShock Risk Voyageur Wood Insert Blower ReplacementDoor Cross Voyageur Wood Insert Tube Channel Assembly Replacement Draft Design and Installation ConsiderationsGetting Started Voyageur Wood Insert Negative Pressure Chimney Termination Requirements Voyageur Wood Insert Locating Your Stove & ChimneyVoyageur Wood Insert Rule Pre-Burn Check List Voyageur Wood Insert Tools And Supplies NeededInspect Appliance and Components Appliance Dimensions Dimensions and ClearancesMaximum Mantel Depth 12 inch 305mm Ember Protection Only Thermal Protection RequiredVoyageur Wood Insert Calculating Alternate Floor Protection Larger Chimneys Chimney SystemsVenting Systems InspectionsVoyageur Wood Insert Masonry Chimney Cont’d Replaces without a permit will void the listing Voyageur Wood Insert Metal Heat Circulating MasonryPrefabricated Metal Chimney Factory-Built Sold Fuel Fireplace Voyageur Wood Insert Securing Chimney ComponentsAltering the Fireplace Chimney Height / Rise and Run Voyageur Wood Insert Ovalizing Round Stainless Steel LinersAppliance Set-up Outside Air Kit InstallationFlue Adapter Leveling LegsVoyageur Wood Insert Securing Appliance to Stove Pipe/Liner Standard Surround & Trim Kit InstallationVoyageur Wood Insert Standard Surround & Cast Trim Kit Voyageur Wood Insert All Cast Surround Kit Blower Cord Installation on Left SidePlacement Slot Blower Access Assembly White Wire Mobile Home Installation Cast Iron Wood Insert Voyageur#7 Baffl e Protection Channel RService Parts#10 Brick Assembly At Depot#14 Access Assembly Stocked at Depot #13 Door Assembly#18 Control Asembly Service PartsStocked This manual may be ordered from an authorized dealer Surrounds see diagrams on following27.6 #27 Surround AssembliesDate of Service Performed By Description of Service Voyageur Wood Insert Service And Maintenance LogVoyageur Wood Insert Service And Maintenance Log Cont’d Contact Information