
R
5100-I ACT WOOD INSERT
B. Blower Cord Location
The
The power cord can also be installed on the left side. Follow instructions below.
Green grounding wire | White wire into Red Connector | |
| ||
Black wire into Blue Connector |
| |
Left Blower |
| |
Snap Disc | Right Blower | |
| ||
Red |
| |
Connector | Snap Disc | |
Blue | ||
Connector | switch | |
| Speed Control | |
| (Rheostat) |
Figure 12.1 - Blower Assembly Components
1.Disconnect the appliance from power supply.
2.Remove the grille following instructions on page 11.
3.Unplug the blower cord wires from the wire harness.
4.Remove green grounding wire from grounding screw.
5.Using a pair of pliers, squeeze the strain relief and remove the blower cord wires and strain relief from the grille.
6.Locate the wire harness wires tucked up under the ash- catcher on the left side of the appliance. Cut the zip tie that is holding the wires in place.
7.Remove the button plug from the left side of grille. Thread the blower cords wires through the hole and snap the strain relief in place. Figure 12.3.
8.Attach grounding wire to ground screw.
9.Connect the white blower cord wire to the red connector on the wire harness.
10.Connect the black blower cord wire to the blue connec- tor on the wire harness.
11.Tuck the wire out of the way of the blower motor.
12.
NOTE: Each wire has a label to denote which component it connects to.
|
|
|
| Blower cord attached to | |
|
|
|
| right side of grille. | |
|
|
|
| Strain Relief | |
Bottom | ofgrille | Blower cord | |||
|
|
|
| ||
|
|
|
| Green | |
|
|
|
| grounding wire | |
|
|
|
| White wire | |
|
|
|
| Grounding | |
|
| of | grille | screw | |
Top | Black wire | ||||
| |||||
|
| ||||
|
|
|
| Back view of grille |
Figure 12.2
| Remove button plug |
grille |
|
of |
|
Bottom |
|
grille | Grounding screw |
| |
of |
|
Top | Back view of left |
| |
| side of grille |
Figure 12.3
Caution
Shock hazard.
• Do NOT remove grounding prong from plug.
•Plug directly into properly grounded 3 prong receptacle.
•Route cord away from appliance.
•Do NOT route cord under or in front of appli- ance.
Page 12 | April 21, 2010 |