Quadra-Fire 5100I-GD-B warranty Zero Clearance Adjustable Trim Support, Size 12 d x 50 w, 2-10 h

Page 23

5100-I ACT WOOD INSERT

R

E.Zero Clearance Adjustable Trim Support

Size: 12” d x 50” w, 2-10” h

Included in Kit:

Tools Needed:

(1) Trim top

Phillips head screwdriver

(1)

Trim front

Sheet metal shears

(2)

Trim sides

Measuring tape

Double-sided tape

Gloves

(already installed)

1.The 10 screws on each set of scissors will already be loose when shipped. Figure 23.1.

2.Expand scissors to desired height. Tighten screws to hold in place using Phillips Head screwdriver. Figure 23.2.

3.Measure front and side trims to required height to cover scissors and mark pieces for cutting. Cut excess mate- rial from top of trim’s edge, not bottom. This edge will be sharp; wear gloves to prevent injury to your hands.

Figure 23.2.

4.Using sheet metal shears, cut trim along the marked edge. The cut edge fits under lip of top trim, so it allows for some variance in your straight edge.

5.The double-sided tape that holds front and side trims to scissors has a particularly powerful bonding adhesive.

Adjustments are extremely difficult once trim has adhered to tape. Do a dry run first without removing paper from tape.

6.Place cut edge of trim under top lip and into position on scissors. Place side pieces on first and then front piece. The front piece overlaps side pieces.

7.Once you are satisfied with the positioning, remove trim and set aside.

8.Remove the paper from double-sided tape that is to accept trim side. Align side and then press hard against tape to secure side piece. Repeat for other side. Install front trim piece last.

NOTE: 3/8 inch (9.5mm) thick tile or like material can be cut to size and fit under lip of top trim edge for a decorative touch.

Figure 23.3.

CAUTION

Sharp Edges

• Wear protective gloves during installation.

EXPLODED VIEW OF SCISSORS

 

SCREWS ARE CIRCLED

D O U B L E -S ID E D TA P E

D O U B L E -S ID E D TA P E

Figure 23.1

EXPAND SCISSORS TO DESIRED HEIGHT

 

 

CUT TOP EDGE OF TRIM,

INSTALL FRONT TRIM LAST.

NOT BOTTOM EDGE

CORNERS OVERLAP SIDE

 

TRIM PIECES

 

Figure 23.2

Decorative tile may

be installed

Figure 23.3

Figure 23.4

April 21, 2010

438-0380E

Page 23

Image 23
Contents Hot glass will cause burns Advanced Combustion Technology ACTManufactured Date Location On right side of insert as face the applianceSerial Number Model NameTable of Contents Mobile Home Approved Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Listing and Code ApprovalsAsphyxiation Risk Fire SafetyDesign, Installation & Location Considerations Getting StartedNegative Pressure Inspect Appliance and Components Flue Draft ConsiderationsTools And Supplies Needed Panel Size Dimensions and ClearancesAppliance Dimensions Calculating Alternate Floor Protection Material Clearance to CombustiblesSideWall Floor Protection USA & CanadaPer Minimum Material Inch Thickness Required Hearth ExtensionHearth Extension Insulation Alternatives, R Value = Outside Air Installation Installation ConsiderationsBlower Cord Location Disconnect the appliance from power supplyOptional Offset Adapter Wiring DiagramLarger Chimneys Chimney RequirementsVenting Systems InspectionsMasonry Chimney Cont’d Prefabricated Metal Chimney Metal Heat Circulating MasonryS629M, Standard for 650oC FACTORY-BUILT Chimneys Prefabricated Metal Chimney Cont’dSecuring Chimney Components Altering the FireplaceChimney Height / Rise and Run Ovalizing Round Stainless Steel Liners Air ClearancesRule Chimney Termination RequirementsFire Risk Asphyxiation Risk Mobile Home InstallationKit Includes Tools Needed Installation Outline Panel & Trim Set InstallationAppliance Set-up Leveling BoltsAssembling Trim Securing Liner to Flue CollarIncluded in Kit Tools Needed Zero Clearance Adjustable Trim SupportSize 12 d x 50 w, 2-10 h Wood Selection & Storage Operating InstructionsOver-Firing Your Appliance Burning ProcessFinal Stage Building a FireSecond Stage BTU / Hr Close Start-Up Air Primary Control Burn Rates & Operating EfficiencyOpacity Primary Air System Air Controls Blower Operating InstructionsStart-up Air System Incorrect Positions Correct Baffle & Blanket PlacementIssues Solutions Frequently Asked QuestionsDisposal of Ashes General MaintenanceCreosote Chimney Cleaning Maintaining & Servicing Your ApplianceWhen cleaning glass Glass CleaningCleaning Plated Surfaces Quick Reference Maintenance Guide Baffle & Blanket PlacementFrequency As needed Glass Replacement Door AssemblyGlass Replacement Side Window Blower Replacement Door Handle Assembly ReplacementNbr Brick Size Qty Firebrick ReplacementBaffle Removal Start Fire Problems Possible Cause Solution TroubleshootingExploded Drawings Reference MaterialsImportant this is Dated Information HOW to Order Service Parts & AccessoriesDescription Comments Part Number Stocked at Depot HOW to OrderDescription Comments Part Number StockedAt Depot Warranty Policy April 21 438-0380E Do DIS N C OT AR D