Quadra-Fire 5100I-GD-B, 5100I-NL-B warranty Firebrick Replacement, Nbr Brick Size Qty

Page 35

5100-I ACT WOOD INSERT

R

G. Firebrick Replacement

Frequency: As needed

By: Homeowner / Qualified service technician

Task: See the following instructions.

The firebox is lined with high quality firebrick, which has exceptional insulating properties. There is no need to use a grate; simply build a fire on the firebox floor. Do not operate appliance without firebrick.

1.Be certain coals are completely cold. Remove all old brick and ash from unit and vacuum out firebox.

2.Remove new brick set from box and lay out to diagram as shown.

3.Lay bottom bricks in unit.

4.Install rear bricks on the top of the bottom bricks. Slide top of bricks under clip on back of firebox wall and push bottom of brick back.

5.Install side bricks. Slide top of brick under clips on side of firebox and push the bottom of the brick until it is flush with the side of the unit.

NOTE: Do not operate unit with any firebrick missing. It will void the warranty.

Nbr

Brick Size

Qty

1

9 x 4-1/2 x 1-1/4”

14

2*

9 x 4-1/2 x 1/1/4” with hole

2

3

9 x 3 x 1-1/4”

2

4

8-1/2 x 1-3/4 x 1-1/4”

2

5

3 x 1-3/4 x 1-1/4”

1

6

9 x 2 x 1-1/4”

2

7

see drawing, Figure 31.2

2

8

see drawing, Figure 31.2

2

9

see drawing, Figure 31.2

2

10

7-1/2 x 3-1/2 x 1-1/4”

2

11

9 x 2-1/4 x 1-1/4”

1

12

8-3/4” X 2-1/4” X 1-1/4”

2

Use Part 832-0550 when ordering individual brick. Provide brick dimension or copy this page, mark the desired brick and take it to your authorized dealer.

*Use Part SRV436-0380 when ordering the 2 bricks with holes.

 

6

5

 

 

 

 

 

 

 

 

 

6

 

1

 

 

 

 

 

2

11

 

 

 

1

1

2

1

1

 

 

 

 

 

 

1

10

9

1

 

1

9

 

 

 

 

10

 

 

 

 

 

 

1

4

1

 

 

 

7

 

 

 

 

 

1

 

1

7

 

 

1

 

 

 

 

8

4

 

1

 

 

 

 

 

 

 

 

12

3

 

 

 

 

8

 

 

3

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

Figure 35.1

6-3/4”

9

7-1/2”

 

 

 

 

4-1/2”

 

4-1/2”

 

 

 

 

 

 

5/8”

 

 

8-1/2”

3/4”

 

8

 

7

 

81o

 

 

 

 

4-7/8”

 

 

3-3/8”

 

 

 

 

 

2-7/8”

3-3/4”

 

 

 

Figure 35.2

April 21, 2010

438-0380E

Page 35

Image 35
Contents Hot glass will cause burns Advanced Combustion Technology ACTManufactured Date Location On right side of insert as face the applianceSerial Number Model NameTable of Contents Mobile Home Approved Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Listing and Code ApprovalsAsphyxiation Risk Fire SafetyDesign, Installation & Location Considerations Getting StartedNegative Pressure Inspect Appliance and Components Flue Draft ConsiderationsTools And Supplies Needed Panel Size Dimensions and ClearancesAppliance Dimensions Calculating Alternate Floor Protection Material Clearance to CombustiblesSideWall Floor Protection USA & CanadaPer Minimum Material Inch Thickness Required Hearth ExtensionHearth Extension Insulation Alternatives, R Value = Outside Air Installation Installation ConsiderationsBlower Cord Location Disconnect the appliance from power supplyOptional Offset Adapter Wiring DiagramLarger Chimneys Chimney RequirementsVenting Systems InspectionsMasonry Chimney Cont’d Prefabricated Metal Chimney Metal Heat Circulating MasonryS629M, Standard for 650oC FACTORY-BUILT Chimneys Prefabricated Metal Chimney Cont’dSecuring Chimney Components Altering the FireplaceChimney Height / Rise and Run Ovalizing Round Stainless Steel Liners Air ClearancesRule Chimney Termination RequirementsFire Risk Asphyxiation Risk Mobile Home InstallationKit Includes Tools Needed Installation Outline Panel & Trim Set InstallationAppliance Set-up Leveling BoltsAssembling Trim Securing Liner to Flue CollarIncluded in Kit Tools Needed Zero Clearance Adjustable Trim SupportSize 12 d x 50 w, 2-10 h Wood Selection & Storage Operating InstructionsOver-Firing Your Appliance Burning ProcessFinal Stage Building a FireSecond Stage BTU / Hr Close Start-Up Air Primary Control Burn Rates & Operating EfficiencyOpacity Primary Air System Air Controls Blower Operating InstructionsStart-up Air System Incorrect Positions Correct Baffle & Blanket PlacementIssues Solutions Frequently Asked QuestionsDisposal of Ashes General MaintenanceCreosote Chimney Cleaning Maintaining & Servicing Your ApplianceWhen cleaning glass Glass CleaningCleaning Plated Surfaces Quick Reference Maintenance Guide Baffle & Blanket PlacementFrequency As needed Glass Replacement Door AssemblyGlass Replacement Side Window Blower Replacement Door Handle Assembly ReplacementNbr Brick Size Qty Firebrick ReplacementBaffle Removal Start Fire Problems Possible Cause Solution TroubleshootingExploded Drawings Reference MaterialsImportant this is Dated Information HOW to Order Service Parts & AccessoriesDescription Comments Part Number Stocked at Depot HOW to OrderDescription Comments Part Number StockedAt Depot Warranty Policy April 21 438-0380E Do DIS N C OT AR D