Quadra-Fire 5100I-GD-B, 5100I-NL-B Troubleshooting, Start Fire Problems Possible Cause Solution

Page 37

 

 

 

 

5100-I ACT WOOD INSERT

R

 

 

 

 

 

10

 

 

With proper installation, operation, and maintenance your appliance

 

 

 

 

 

 

 

 

 

 

 

 

provide years of trouble-free service. If you do experience a problem,

 

 

 

 

Troubleshooting

this troubleshooting guide will assist a qualified service person in the

 

 

 

 

diagnosis of a problem and the corrective action to be taken.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Start Fire Problems

Possible Cause

Solution

 

 

 

 

 

 

 

 

 

Can’t get fire started

Not enough kindling/paper or no

Use dry kindling, more paper. Arrange kindling &

 

 

 

Excessive smoke or

kindling/paper

 

wood for air movement.

 

 

 

spillage

 

 

 

 

 

 

 

 

Not enough air for fire to ignite

Check for restricted cap/shroud

 

 

 

Burns too slowly

 

 

 

 

 

 

 

 

 

 

 

Smolders, sizzles

 

 

 

 

 

 

 

 

 

 

 

 

Check for flue blockage.

 

 

 

 

 

 

 

 

Pre-warm flue before starting fire (refer to starting

 

 

 

 

 

 

 

 

fire section).

 

 

 

 

 

 

 

 

Check for adequate vent height (refer to chimney

 

 

 

 

 

 

 

 

assembly section).

 

 

 

 

 

 

 

 

Open window below the appliance towards the

 

 

 

 

 

 

 

 

wind.

 

 

 

 

 

 

Wood condition is too wet, too

Use dry, seasoned wood (refer to wood fuel

 

 

 

 

 

 

large

 

section).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bed of coals not established

Start with paper & kindling to establish bed of coals

 

 

 

 

 

 

before adding wood

(refer to starting fire section).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flue blockage such as birds’ nests

Have chimney inspected for creosote and cleaned

 

 

 

 

 

 

or leaves in termination cap

by a certified chimney sweep.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Down draft or negative pressure

Do not use exhaust fans during start-up (refer to

 

 

 

 

 

 

Competition with exhaust devices

negative pressure section).

 

 

 

 

 

 

 

 

Open window below the appliance towards the

 

 

 

 

 

 

 

 

wind.

 

 

 

Fire burns too fast

 

Extremely dry or soft wood

 

 

 

 

 

 

 

 

 

Mix in less seasoned wood after fire is established

 

 

 

 

 

 

 

 

(refer to wood fuel section).

 

 

 

 

 

 

Overdrafting

 

Check for correct vent height; too much vertical

 

 

 

 

 

 

 

 

height creates overdrafting.

 

 

 

 

 

 

 

 

Check location of vent termination (refer to chimney

 

 

 

 

 

 

 

 

 

 

 

April 21, 2010

438-0380E

Page 37

Image 37
Contents Hot glass will cause burns Advanced Combustion Technology ACTSerial Number Location On right side of insert as face the applianceModel Name Manufactured DateTable of Contents Glass Specifications Appliance Certification BTU & Efficiency SpecificationsListing and Code Approvals Mobile Home ApprovedDesign, Installation & Location Considerations Fire SafetyGetting Started Asphyxiation RiskNegative Pressure Tools And Supplies Needed Flue Draft ConsiderationsInspect Appliance and Components Appliance Dimensions Dimensions and ClearancesPanel Size SideWall Clearance to CombustiblesFloor Protection USA & Canada Calculating Alternate Floor Protection MaterialHearth Extension Insulation Alternatives, R Value = Hearth ExtensionPer Minimum Material Inch Thickness Required Outside Air Installation Installation ConsiderationsBlower Cord Location Disconnect the appliance from power supplyOptional Offset Adapter Wiring DiagramVenting Systems Chimney RequirementsInspections Larger ChimneysMasonry Chimney Cont’d Prefabricated Metal Chimney Metal Heat Circulating MasonrySecuring Chimney Components Prefabricated Metal Chimney Cont’dAltering the Fireplace S629M, Standard for 650oC FACTORY-BUILT ChimneysChimney Height / Rise and Run Ovalizing Round Stainless Steel Liners Air ClearancesRule Chimney Termination RequirementsFire Risk Asphyxiation Risk Mobile Home InstallationAppliance Set-up Installation Outline Panel & Trim Set InstallationLeveling Bolts Kit Includes Tools NeededAssembling Trim Securing Liner to Flue CollarSize 12 d x 50 w, 2-10 h Zero Clearance Adjustable Trim SupportIncluded in Kit Tools Needed Over-Firing Your Appliance Operating InstructionsBurning Process Wood Selection & StorageSecond Stage Building a FireFinal Stage Opacity Burn Rates & Operating EfficiencyBTU / Hr Close Start-Up Air Primary Control Start-up Air System Air Controls Blower Operating InstructionsPrimary Air System Incorrect Positions Correct Baffle & Blanket PlacementIssues Solutions Frequently Asked QuestionsCreosote Chimney Cleaning General MaintenanceMaintaining & Servicing Your Appliance Disposal of AshesCleaning Plated Surfaces Glass CleaningWhen cleaning glass Quick Reference Maintenance Guide Baffle & Blanket PlacementGlass Replacement Side Window Glass Replacement Door AssemblyFrequency As needed Blower Replacement Door Handle Assembly ReplacementNbr Brick Size Qty Firebrick ReplacementBaffle Removal Start Fire Problems Possible Cause Solution TroubleshootingExploded Drawings Reference MaterialsImportant this is Dated Information HOW to Order Service Parts & AccessoriesDescription Comments Part Number Stocked at Depot HOW to OrderAt Depot StockedDescription Comments Part Number Warranty Policy April 21 438-0380E Do DIS N C OT AR D