Quadra-Fire 5100I-NL-B, 5100I-GD-B Metal Heat Circulating Masonry, Prefabricated Metal Chimney

Page 16

R

5100-I ACT WOOD INSERT

E. Metal Heat Circulating Masonry

This insert conforms with the safety standard UL-1482 and ULC S628 (Canada) in all respects and is approved to UL & ULC safety standards for installation and use within a fire- place with masonry chimney, in accordance with NFPA 211, with a direct flue collar connection.

•The original factory-built clearance fireplace chimney cap must be re-installed after installing the approved chimney liner meeting type UL 103 HT requirements (2100°F) per UL 1777.

•If the chimney is not listed as meeting HT requirements, or if the factory built fireplace was tested prior to 1998, a full height listed chimney liner must be installed from the appliance flue collar to the chimney top.

F. Prefabricated Metal Chimney

The chimney can be new or existing, masonry or prefabricated and must meet the following minimum requirements:

•Must be minimum 6 inch (152mm) inside diameter of high temperature chimney listed to UL 103 HT (2100oF) or ULC S628.

•Must use components required by the manufacturer for installation.

•Must maintain clearances required by the manufacturer for installation.

•Refer to manufacturers instructions for installation

•This insert is listed to UL 1482 Standard and is approved for installation into listed factory-built zero clearance fireplaces listed to UL 127 conforming to the following specifications and instructions:

•The liner must be securely attached to the insert flue collar and the chimney top.

•The air flow of the factory-built zero-clearance fireplace system must not be altered. The flue liner top support attachment must not reduce the air flow for the existing air-cooled chimney system.

•No dilution air is allowed to enter the chimney.

1.Secure the fireplace damper in the open position. If this cannot be accomplished, it will be necessary to remove the damper

2.Seal damper area of chimney around chimney connector with a high temperature sealant or seal insert against the face of the fireplace.

3.Both methods must be removable and replaceable for cleaning and re-installation.

Flue Liner with Required Air Space

 

Stainless Steel Chimney Connector

 

Must Extend to Flue Liner

 

Minimum 8” (203mm) Masonry Thickness

 

in Front of Smoke Chamber

 

 

Airtight Insulated Clean-Out

Minimum Clearance in Accordance with

 

Insert Listing

Damper Plate Removed or

 

 

Fastened in Open Position

Floor Protection in

 

Accordance with Insert

Seal with Non-

Listing

Combustible Material

 

Combustible Floor

 

Figure 16.1

Page 16

438-0380E

April 21, 2010

Image 16
Contents Advanced Combustion Technology ACT Hot glass will cause burnsLocation On right side of insert as face the appliance Serial NumberModel Name Manufactured DateTable of Contents Appliance Certification BTU & Efficiency Specifications Glass SpecificationsListing and Code Approvals Mobile Home ApprovedFire Safety Design, Installation & Location ConsiderationsGetting Started Asphyxiation RiskNegative Pressure Tools And Supplies Needed Flue Draft ConsiderationsInspect Appliance and Components Appliance Dimensions Dimensions and ClearancesPanel Size Clearance to Combustibles SideWallFloor Protection USA & Canada Calculating Alternate Floor Protection MaterialHearth Extension Insulation Alternatives, R Value = Hearth ExtensionPer Minimum Material Inch Thickness Required Installation Considerations Outside Air InstallationDisconnect the appliance from power supply Blower Cord LocationWiring Diagram Optional Offset AdapterChimney Requirements Venting SystemsInspections Larger ChimneysMasonry Chimney Cont’d Metal Heat Circulating Masonry Prefabricated Metal ChimneyPrefabricated Metal Chimney Cont’d Securing Chimney ComponentsAltering the Fireplace S629M, Standard for 650oC FACTORY-BUILT ChimneysOvalizing Round Stainless Steel Liners Air Clearances Chimney Height / Rise and RunChimney Termination Requirements RuleMobile Home Installation Fire Risk Asphyxiation RiskInstallation Outline Panel & Trim Set Installation Appliance Set-upLeveling Bolts Kit Includes Tools NeededSecuring Liner to Flue Collar Assembling TrimSize 12 d x 50 w, 2-10 h Zero Clearance Adjustable Trim SupportIncluded in Kit Tools Needed Operating Instructions Over-Firing Your ApplianceBurning Process Wood Selection & StorageSecond Stage Building a FireFinal Stage Opacity Burn Rates & Operating EfficiencyBTU / Hr Close Start-Up Air Primary Control Start-up Air System Air Controls Blower Operating InstructionsPrimary Air System Correct Baffle & Blanket Placement Incorrect PositionsFrequently Asked Questions Issues SolutionsGeneral Maintenance Creosote Chimney CleaningMaintaining & Servicing Your Appliance Disposal of AshesCleaning Plated Surfaces Glass CleaningWhen cleaning glass Baffle & Blanket Placement Quick Reference Maintenance GuideGlass Replacement Side Window Glass Replacement Door AssemblyFrequency As needed Door Handle Assembly Replacement Blower ReplacementFirebrick Replacement Nbr Brick Size QtyBaffle Removal Troubleshooting Start Fire Problems Possible Cause SolutionReference Materials Exploded DrawingsService Parts & Accessories Important this is Dated Information HOW to OrderHOW to Order Description Comments Part Number Stocked at DepotAt Depot StockedDescription Comments Part Number Warranty Policy April 21 438-0380E Do DIS N C OT AR D