Quadra-Fire 5100I-NL-B, 5100I-GD-B warranty Securing Liner to Flue Collar, Assembling Trim

Page 22

R

5100-I ACT WOOD INSERT

2.Assembling Trim

a.Place protective covering on surface to be used to assemble the trim pieces. Lay the trim face down.

b.Attach the 2 side trim pieces to the top trim at each corner using the “L” bracket included in fasteners package. Slide assembled trim over panel set.

Figure 22.1.

NOTE: If you have a mantel, you may need to install the trim on your panels before you push the insert into the fireplace opening. If not, you can slide the trim over the panel set after the insert is in its final position.

D. Securing Liner to Flue Collar

There are two options to secure the liner to the flue collar:

Option One: If there is enough room on the top of the insert to work, hand bend the 2 tabs upward 90°. Secure the liner with the supplied hex head bolts 1/4-20-3/4.

Option Two: Remove the manifold tubes, fiberboard baffle and ceramic blanket. From inside the firebox, pull liner down through the chimney ring below the outer skin. There are 2 pre-drilled holes in the chimney ring 180° apart. Secure the liner with the supplied hex head bolts 1/4-20-3/4. See Fig- ures 36.1 and 36.2 on page 36 for details for removing the manifold tubes, baffle and ceramic blanket.

View of “L” bracket installed

2 pre-drilled holes on flue collar under outer skin (access through firebox)

Figure 22.1

Attach liner with 2 tabs

Figure 22.2

NOTE: Tabs are shipped from factory in a flat position. Bend upwards 90 degrees as show in Figure 22.2

Page 22

438-0380E

April 21, 2010

Image 22
Contents Advanced Combustion Technology ACT Hot glass will cause burnsModel Name Location On right side of insert as face the applianceSerial Number Manufactured DateTable of Contents Listing and Code Approvals Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Mobile Home ApprovedGetting Started Fire SafetyDesign, Installation & Location Considerations Asphyxiation RiskNegative Pressure Tools And Supplies Needed Flue Draft ConsiderationsInspect Appliance and Components Appliance Dimensions Dimensions and ClearancesPanel Size Floor Protection USA & Canada Clearance to CombustiblesSideWall Calculating Alternate Floor Protection MaterialHearth Extension Insulation Alternatives, R Value = Hearth ExtensionPer Minimum Material Inch Thickness Required Installation Considerations Outside Air InstallationDisconnect the appliance from power supply Blower Cord LocationWiring Diagram Optional Offset AdapterInspections Chimney RequirementsVenting Systems Larger ChimneysMasonry Chimney Cont’d Metal Heat Circulating Masonry Prefabricated Metal ChimneyAltering the Fireplace Prefabricated Metal Chimney Cont’dSecuring Chimney Components S629M, Standard for 650oC FACTORY-BUILT ChimneysOvalizing Round Stainless Steel Liners Air Clearances Chimney Height / Rise and RunChimney Termination Requirements RuleMobile Home Installation Fire Risk Asphyxiation RiskLeveling Bolts Installation Outline Panel & Trim Set InstallationAppliance Set-up Kit Includes Tools NeededSecuring Liner to Flue Collar Assembling TrimSize 12 d x 50 w, 2-10 h Zero Clearance Adjustable Trim SupportIncluded in Kit Tools Needed Burning Process Operating InstructionsOver-Firing Your Appliance Wood Selection & StorageSecond Stage Building a FireFinal Stage Opacity Burn Rates & Operating EfficiencyBTU / Hr Close Start-Up Air Primary Control Start-up Air System Air Controls Blower Operating InstructionsPrimary Air System Correct Baffle & Blanket Placement Incorrect PositionsFrequently Asked Questions Issues SolutionsMaintaining & Servicing Your Appliance General MaintenanceCreosote Chimney Cleaning Disposal of AshesCleaning Plated Surfaces Glass CleaningWhen cleaning glass Baffle & Blanket Placement Quick Reference Maintenance GuideGlass Replacement Side Window Glass Replacement Door AssemblyFrequency As needed Door Handle Assembly Replacement Blower ReplacementFirebrick Replacement Nbr Brick Size QtyBaffle Removal Troubleshooting Start Fire Problems Possible Cause SolutionReference Materials Exploded DrawingsService Parts & Accessories Important this is Dated Information HOW to OrderHOW to Order Description Comments Part Number Stocked at DepotAt Depot StockedDescription Comments Part Number Warranty Policy April 21 438-0380E Do DIS N C OT AR D