Quadra-Fire 5100I-NL-B, 5100I-GD-B Dimensions and Clearances, Appliance Dimensions, Panel Size

Page 8

 

R

5100-I ACT WOOD INSERT

 

 

 

 

 

 

3

Dimensions and Clearances

 

 

 

 

 

A. Appliance Dimensions

 

TOP VIEW

NOTE: Flue Collar: 6 inch (152mm) diameter (ID)

34-3/16" (919mm)

25-5/8"

(651mm)

C

L

17-5/8"

(448mm)

12-7/8"

(327mm)

12.0"

(305mm)

SIDE VIEW

 

26-3/4"

 

 

(679mm)

9-1/8"

 

 

 

 

(232mm)

22-1/4"

 

 

(565mm)

 

21-1/8"

 

 

 

 

(537mm)

 

 

10-1/2"

 

 

(267mm)

 

29-5/8"

 

 

(752mm)

 

39-1/8" (994mm)

FRONT VIEW

A

39-1/8"

(994mm)

B

Panel Size

A

B

Standard

47 in.

30-1/2 in.

Large

51-1/4 in.

34-1/4 in.

 

 

 

Page

438-0380E

April 21, 2010

Image 8
Contents Advanced Combustion Technology ACT Hot glass will cause burnsLocation On right side of insert as face the appliance Serial NumberModel Name Manufactured DateTable of Contents Appliance Certification BTU & Efficiency Specifications Glass SpecificationsListing and Code Approvals Mobile Home Approved Fire Safety Design, Installation & Location Considerations Getting Started Asphyxiation RiskNegative Pressure Inspect Appliance and Components Flue Draft ConsiderationsTools And Supplies Needed Panel Size Dimensions and ClearancesAppliance Dimensions Clearance to Combustibles SideWallFloor Protection USA & Canada Calculating Alternate Floor Protection MaterialPer Minimum Material Inch Thickness Required Hearth ExtensionHearth Extension Insulation Alternatives, R Value = Installation Considerations Outside Air InstallationDisconnect the appliance from power supply Blower Cord LocationWiring Diagram Optional Offset AdapterChimney Requirements Venting SystemsInspections Larger ChimneysMasonry Chimney Cont’d Metal Heat Circulating Masonry Prefabricated Metal ChimneyPrefabricated Metal Chimney Cont’d Securing Chimney ComponentsAltering the Fireplace S629M, Standard for 650oC FACTORY-BUILT ChimneysOvalizing Round Stainless Steel Liners Air Clearances Chimney Height / Rise and RunChimney Termination Requirements RuleMobile Home Installation Fire Risk Asphyxiation RiskInstallation Outline Panel & Trim Set Installation Appliance Set-upLeveling Bolts Kit Includes Tools NeededSecuring Liner to Flue Collar Assembling TrimIncluded in Kit Tools Needed Zero Clearance Adjustable Trim SupportSize 12 d x 50 w, 2-10 h Operating Instructions Over-Firing Your ApplianceBurning Process Wood Selection & StorageFinal Stage Building a FireSecond Stage BTU / Hr Close Start-Up Air Primary Control Burn Rates & Operating EfficiencyOpacity Primary Air System Air Controls Blower Operating InstructionsStart-up Air System Correct Baffle & Blanket Placement Incorrect PositionsFrequently Asked Questions Issues SolutionsGeneral Maintenance Creosote Chimney CleaningMaintaining & Servicing Your Appliance Disposal of AshesWhen cleaning glass Glass CleaningCleaning Plated Surfaces Baffle & Blanket Placement Quick Reference Maintenance GuideFrequency As needed Glass Replacement Door AssemblyGlass Replacement Side Window Door Handle Assembly Replacement Blower ReplacementFirebrick Replacement Nbr Brick Size QtyBaffle Removal Troubleshooting Start Fire Problems Possible Cause SolutionReference Materials Exploded DrawingsService Parts & Accessories Important this is Dated Information HOW to OrderHOW to Order Description Comments Part Number Stocked at DepotDescription Comments Part Number StockedAt Depot Warranty Policy April 21 438-0380E Do DIS N C OT AR D