New Buck Corporation 21 installation instructions

Page 2
Image 2
Contents Buck Stove MODEL NON-CATALYTICUNITMODEL NON-CAT Page TABLE OF CONTENTS READ THIS FIRST IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL SECTION INTRODUCTIONMODEL MASONRY INSERT INSTALLATIONSECTION Floor Protection MASONRY INSERT INSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION STARTER PIPE SEAL TRIM PANELS AND UNDER AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN FRONT OF STOVE UNIT WITH INSULATION OR HIGHMOUNTING THE TRIM PANELS POSITIONING THE HEATERPOSITIONING FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION Chimney1. Convert specification to R-value Floor ProtectionPREPARING THE ROOM HEATER LOCATION HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation CHIMNEYModel 21 minimum clearance to combustibles NOTE For minimum clearances See Page 17, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation Model 21 minimum clearance to combustibles Without close clearance shield and pipe shield Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL NOTE For minimum clearances See Page 19, Figureany listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustiblesNOTE For minimum clearances See Page 23, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation any listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesNOTE For minimum clearances See Page 25, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK Chimney SECTION ALCOVE INSTALLATION AND CLEARANCESPREPARING THE STOVE FOR INSTALLATION 1. Convert specification to R-value Floor ProtectionAlcove Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLModel 21 minimum clearance to combustibles ALCOVE INSTALLATION AND CLEARANCESany listed 2100 UL 103 HT. TYPE Chimney Pipe Shield Loosen these top shield screws Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS