New Buck Corporation 21 Installation, Operation, And, Maintenance Instructions Model

Page 4
INSTALLATION, OPERATION, AND

INSTALLATION, OPERATION, AND

MAINTENANCE INSTRUCTIONS

MODEL 21

READ THIS FIRST

IMPORTANT INSTRUCTIONS

The New Buck Corp. non-catalytic systems have been tested by ITS, Warnock Hersey to ANSI/UL Standards 1482.

Install and operate your units according to instructions provided in this manual. Local building codes may apply; therefore, contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instructions. The authority having jurisdiction should be consulted before installation to determine the need to obtain a permit.

If appliance is installed in mobile homes: “DO NOT INSTALL IN SLEEPING ROOMS.”

The Model 21 is approved for use in specified Pre-Fabricated fireplaces (ZCF’s). Use the list on Page 11 or contact your dealer for additional units.

Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions, that it is free from cracks, loose mortar, creosote deposits and other blockage, or other signs of deterioration.

2

Image 4
Contents MODEL NON-CAT MODEL NON-CATALYTICUNITBuck Stove Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONS SECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATIONMODEL Floor Protection INSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION OPTIONS AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPER OR WIRE IT OPENSTARTER PIPE SEAL TRIM PANELS AND UNDER FRONT OF STOVE UNIT WITH INSULATION OR HIGHPOSITIONING THE HEATER POSITIONINGMOUNTING THE TRIM PANELS FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION Chimney1. Convert specification to R-value Floor ProtectionHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential InstallationPREPARING THE ROOM HEATER LOCATION CHIMNEYModel 21 minimum clearance to combustibles Residential Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 17, Figure Model 21 minimum clearance to combustibles Residential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLWithout close clearance shield and pipe shield NOTE For minimum clearances See Page 19, Figureany listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 23, Figure any listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 25, Figure Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK PREPARING THE STOVE FOR INSTALLATION SECTION ALCOVE INSTALLATION AND CLEARANCESChimney 1. Convert specification to R-value Floor ProtectionAlcove Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLany listed 2100 UL 103 HT. TYPE Chimney ALCOVE INSTALLATION AND CLEARANCESModel 21 minimum clearance to combustibles Installation of Optional Close Clearance Shields Installation of Optional Pipe ShieldPipe Shield Loosen these top shield screws 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESECTION TROUBLESHOOTING PROBLEMSOLUTION POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE WARRANTY TIME PERIODS PROCEDURENEW BUCK CORPORATION NBC PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS