New Buck Corporation 21 installation instructions

Page 29
Manual background

14.From under the mobile home, slip the duct up through the 4-1/4" hole. Push up until the face of the outside air duct contacts the underside of the floor of the mobile home. For certain floor thickness, you may have to shorten the length of the outside air duct.

15.Secure the outside air duct to the floor using the four (4) #10x1 screws provided. (See Figure 19.)

RAINCAP

RAIN CAP

24" min.(610mm)

36" TYP36"..

Manual backgroundManual backgroundFLASHING

RADIATIONON SH ELD

SHIELD

20 FT. MAX.

20 ft. MAX

24" in.

 

24" min.(610mm)

36" 36"TYP. .

(610 mm)

 

FLASHING

 

RADIATIONTION SHIELD

 

SHIELD

OUT SIDE AIR DUCT THROUGH FLOOR WHEN

 

OUT SIDE AIR DUCT THROUGH FLOOR WHEN

TSIDE AIR DUCT TH OUGH FLOOR WHEN

 

 

MOBLE HOME IS NOT UNDERPENNED

 

OUTSIDE A R DUCT THROUGH UNDERPE

MOBILE HOME IS NOT UNDERPINNED

 

 

MOBILE HOME IS UNDERPINNED

 

 

 

Figure 19

27

Image 29
Contents Buck Stove MODEL NON-CATALYTICUNITMODEL NON-CAT Page TABLE OF CONTENTS READ THIS FIRST IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL INTRODUCTION SECTIONMODEL MASONRY INSERT INSTALLATIONSECTION Floor Protection MASONRY INSERT INSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION OR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPERSTARTER PIPE SEAL TRIM PANELS AND UNDER FRONT OF STOVE UNIT WITH INSULATION OR HIGHPOSITIONING POSITIONING THE HEATERMOUNTING THE TRIM PANELS FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION Chimney PREPARING THE STOVE FOR INSTALLATIONFloor Protection 1. Convert specification to R-valueResidential Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLPREPARING THE ROOM HEATER LOCATION CHIMNEYModel 21 minimum clearance to combustibles NOTE For minimum clearances See Page 17, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation Model 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationWithout close clearance shield and pipe shield NOTE For minimum clearances See Page 19, FigureModel 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles Listed 2100 UL HT T-BoxassemblyNOTE For minimum clearances See Page 23, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyNOTE For minimum clearances See Page 25, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK Chimney SECTION ALCOVE INSTALLATION AND CLEARANCESPREPARING THE STOVE FOR INSTALLATION Floor Protection 1. Convert specification to R-valueHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Alcove InstallationModel 21 minimum clearance to combustibles ALCOVE INSTALLATION AND CLEARANCESany listed 2100 UL 103 HT. TYPE Chimney Installation of Optional Pipe Shield Installation of Optional Close Clearance ShieldsPipe Shield Loosen these top shield screws 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS