New Buck Corporation 21 installation instructions Alcove Installation And Clearances

Page 34
ALCOVE INSTALLATION

ALCOVE INSTALLATION

AND CLEARANCES

E. Vertical exit using (6" DVL Close Clearance pipe, and

any listed 2100° UL 103 HT. TYPE Chimney).

With optional close clearance shield, and pipe shield.

Model 21 minimum clearance to combustibles.

Figure 22.

Figure 23.

BACK WALL

BB GD FF

SIDE WALL

EE

PROTECTOR

 

 

 

A

 

CONTEMPORARY CAP

LISTED 2100° UL 103 HT

TYP. CHIMNEY

CAULK

Manual backgroundManual backgroundManual background STORM COLLAR

H

G

FLASHING

RADIATION SHIELD

LISTED 2100° UL 103 HT TYP. Manual background

INSTALLATION Manual backgroundManual background

CEILING

C

SIDE

WALL

CEILING SUPPORT

DVL CLOSE

CLEARANCE PIPE

BUCK STOVE

 

A

B

C

D E

MODEL 21

19”

7"

84"

8.5" 8"

optional pipe shield.

NOTE:

See Page 33 for

Manual background installation of

optional close

Manual backgroundManual backgroundManual backgroundManual background clearance shields Manual backgroundManual backgroundand pipe shield

F

G

H

 

optional close

3" 16"

48"

 

BUCK STOVE

clearance shield

 

 

 

NEW BUCK

 

NOTE: All clearances are to combustibles with optional close clearance shields, and pipe shield, using DVL Close Clearance pipe, and minimum floor protector.

32

Image 34
Contents MODEL NON-CAT MODEL NON-CATALYTICUNITBuck Stove Page TABLE OF CONTENTS MAINTENANCE INSTRUCTIONS MODEL INSTALLATION, OPERATION, ANDREAD THIS FIRST IMPORTANT INSTRUCTIONS SECTION INTRODUCTIONSECTION MASONRY INSERT INSTALLATIONMODEL Floor Protection INSTALLATION PREPARATION POSSIBLE TOOLS NEEDED FOR INSTALLATIONMASONRY INSERT INSTALLATION OPTIONS STARTER PIPE SEAL TRIM PANELS AND UNDER AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN FRONT OF STOVE UNIT WITH INSULATION OR HIGHMOUNTING THE TRIM PANELS POSITIONING THE HEATERPOSITIONING FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION Chimney1. Convert specification to R-value Floor ProtectionPREPARING THE ROOM HEATER LOCATION HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation CHIMNEYModel 21 minimum clearance to combustibles Residential Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 17, Figure Model 21 minimum clearance to combustibles Without close clearance shield and pipe shield Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL NOTE For minimum clearances See Page 19, Figureany listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 23, Figure any listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesResidential and Mobile Home Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLNOTE For minimum clearances See Page 25, Figure Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK PREPARING THE STOVE FOR INSTALLATION SECTION ALCOVE INSTALLATION AND CLEARANCESChimney 1. Convert specification to R-value Floor ProtectionAlcove Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLany listed 2100 UL 103 HT. TYPE Chimney ALCOVE INSTALLATION AND CLEARANCESModel 21 minimum clearance to combustibles Pipe Shield Loosen these top shield screws Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSESOLUTION PROBLEMPOSSIBLE CAUSE NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS