New Buck Corporation 21 Alcove Installation, How To Locate Chimney Exit, And Install

Page 33

HOW TO LOCATE CHIMNEY EXIT, AND INSTALL

Alcove Installation.

E. Vertical Exit using (6" DVL Close Clearance pipe, and any Listed 2100° UL 103 HT chimney).

With optional close clearance shield and pipe shield. NOTE: For installation of of optional close clearance shields and pipe shield (See Page 33).

NOTE: For minimum clearances (See Page 32, Figure 22).

1.Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. (A small weight on a string will serve as a plumb bob.) Mark the ceiling where the string is suspended to locate the center of the chimney.

2.After locating the center of the hole, install the ceiling support box, chimney or chimney connector, flashing, and rain cap per the chimney manufacturer’s instructions, and local building codes for installation through combustible walls or ceilings.

3.Now connect the stove and ceiling support box using DVL close clearance pipe. Connect each section per manufacturer’s instructions.

Secure each section to each other using minimum (3) sheet metal screws or rivets. DVL close clearance is to be connected with (3) sheet metal screws or rivets to connector collar on heater.(See Page 32,Figure 23).

31

Image 33
Contents MODEL NON-CATALYTICUNIT MODEL NON-CATBuck Stove Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONS INTRODUCTION SECTIONMASONRY INSERT INSTALLATION SECTIONMODEL Floor Protection POSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION OPTIONS OR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPERSTARTER PIPE SEAL TRIM PANELS AND UNDER FRONT OF STOVE UNIT WITH INSULATION OR HIGHPOSITIONING POSITIONING THE HEATERMOUNTING THE TRIM PANELS FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION Chimney PREPARING THE STOVE FOR INSTALLATIONFloor Protection 1. Convert specification to R-valueResidential Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLPREPARING THE ROOM HEATER LOCATION CHIMNEYModel 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential InstallationNOTE For minimum clearances See Page 17, Figure Model 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationWithout close clearance shield and pipe shield NOTE For minimum clearances See Page 19, FigureModel 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustibles Listed 2100 UL HT T-BoxassemblyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 23, Figure Model 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 25, Figure Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK SECTION ALCOVE INSTALLATION AND CLEARANCES PREPARING THE STOVE FOR INSTALLATIONChimney Floor Protection 1. Convert specification to R-valueHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Alcove InstallationALCOVE INSTALLATION AND CLEARANCES any listed 2100 UL 103 HT. TYPE ChimneyModel 21 minimum clearance to combustibles Installation of Optional Pipe Shield Installation of Optional Close Clearance ShieldsPipe Shield Loosen these top shield screws 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPROBLEM SOLUTIONPOSSIBLE CAUSE PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS