New Buck Corporation 21 Pipe Shield Loosen these top shield screws, 13/16” TYP 1” TYP 1/4” TYP

Page 35
Pipe Shield

Installation of (Optional) Close Clearance Shields and Pipe Shield

1.Taking close clearance side shields, hold up to side of stove leaving 1/4" gap between shield and top of stove.

2.Make reference mark in center of pre-punched hole in top & bottom of shield. Drill two

(2) 3/32" holes in back of unit on each side. Insert self tapping screws in through shield into stove.(SEE PICTURE BELOW)

3.Drill two (2) 3/16" holes in the sides of the stove where the shield meets the front side. Insert two (2) 3/8" self-tapping screws. (SEE PICTURE BELOW)

4.Next loosen two (2) top screws holding side shield at rear top. Insert pipe shield where back shield and top rear side shield meets. Leave a 1” gap from the top of stove to the pipe shield, tighten screws.(SEE PICTURE BELOW)

Pipe Shield

Loosen these top shield screws

13/16” TYP.

1” TYP.

1/4” TYP.

13/16” TYP.Close Clearance Shields Close Clearance Shields

Installation of (Optional) Close Clearance Shields

Installation of (Optional) Pipe Shield

33

Image 35
Contents Buck Stove MODEL NON-CATALYTICUNITMODEL NON-CAT Page TABLE OF CONTENTS READ THIS FIRST IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL INTRODUCTION SECTIONMODEL MASONRY INSERT INSTALLATIONSECTION Floor Protection MASONRY INSERT INSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION FRONT OF STOVE UNIT WITH INSULATION OR HIGH AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN STARTER PIPE SEAL TRIM PANELS AND UNDERFIGURE 3 MOUNTING TRIM PANELS POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION Chimney PREPARING THE STOVE FOR INSTALLATIONFloor Protection 1. Convert specification to R-valueCHIMNEY HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation PREPARING THE ROOM HEATER LOCATIONModel 21 minimum clearance to combustibles NOTE For minimum clearances See Page 17, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation Model 21 minimum clearance to combustibles NOTE For minimum clearances See Page 19, Figure Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Without close clearance shield and pipe shieldModel 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles Listed 2100 UL HT T-BoxassemblyNOTE For minimum clearances See Page 23, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyNOTE For minimum clearances See Page 25, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK Chimney SECTION ALCOVE INSTALLATION AND CLEARANCESPREPARING THE STOVE FOR INSTALLATION Floor Protection 1. Convert specification to R-valueHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Alcove InstallationModel 21 minimum clearance to combustibles ALCOVE INSTALLATION AND CLEARANCESany listed 2100 UL 103 HT. TYPE Chimney 13/16” TYP 1” TYP 1/4” TYP Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield Pipe Shield Loosen these top shield screwsFINAL CHECK SECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONPOSSIBLE CAUSE PROBLEMSOLUTION PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS