New Buck Corporation 21 installation instructions Table Of Contents

Page 3

TABLE OF CONTENTS

Important Instructions……………………………………………………………………………2

SECTION I: Introduction ………………………………………………………………………..3

SECTION II: Masonry Insert Installation………………………………………………………..4

Floor Protection ………………………………………………………………………………….5

Masonry Insert Installation options …….……..…………………………………………………6

Mounting the Trim Panels ……………………………………………………………………….8

SECTION III: Pre-Fab Insert Installation………………………………………………………11

SECTION IV: Residential and Mobil Home Freestanding Installation ………………………..12

Floor Protection ……………………………………………………………………………….13

A.Vertical Exit Using Single Wall Pipe /Listed 2100° UL 103 HT chimney w/out

Close Clearance/Pipe Shields……………………………………………....……………....14

B.Vertical Wall Exit Using Single Wall Pipe and Elbow /Listed 2100° UL 103 HT Chimney and T-BOX assembily w/out Close Clearance/Pipe Shields……………………………..…16

C.Vertical Exit Using DVL Close Clearance Pipe /Listed 2100° UL 103 HT chimney w/out Close Clearance/Pipe Shields...………………………………………….…....………..…...18

D.Vertical Wall Exit Using DVL Close Clearance Pipe ,and Elbow /Listed 2100° UL 103 HT

Chimney and T-BOX assembly w/out Close Clearance/Pipe Shields..…………………......20

Installation of Close Clearances Shields………………………………………………………..22

E. Vertical Exit Using DVL Close Clearance Pipe /Listed 2100° UL 103 HT chimney w/ith Close Clearance/Pipe Shields…………………………………………………………. …...23

F. Vertical Wall Exit Using DVL Close Clearance Pipe ,and Elbow /Listed 2100° UL 103 HT Chimney and T-BOX assembly withClose Clearance/Pipe Shields…………………...…25

Out Side Air Installation………………………………………………………………………..27

SECTION V: Alcove Installation ……………………………………………………………..30

Floor Protection ………………………………………………………………………………...31

Alcove Installation Clearances………………………………………………………………….31

SECTION VI: Wood Heater Safety…………………………………………………………….35

SECTION VII: Operation………………………………………………………………………36

SECTION VIII: Troubleshooting………………………………………………………………37

LIMITED WARRANTY ……………………………………………………………...………39

1

Image 3
Contents MODEL NON-CATALYTICUNIT MODEL NON-CATBuck Stove Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONS INTRODUCTION SECTIONMASONRY INSERT INSTALLATION SECTIONMODEL Floor Protection POSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION OPTIONS FRONT OF STOVE UNIT WITH INSULATION OR HIGH AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN STARTER PIPE SEAL TRIM PANELS AND UNDERFIGURE 3 MOUNTING TRIM PANELS POSITIONING THE HEATERPOSITIONING MOUNTING THE TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION Chimney PREPARING THE STOVE FOR INSTALLATIONFloor Protection 1. Convert specification to R-valueCHIMNEY HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation PREPARING THE ROOM HEATER LOCATIONModel 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential InstallationNOTE For minimum clearances See Page 17, Figure Model 21 minimum clearance to combustibles NOTE For minimum clearances See Page 19, Figure Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Without close clearance shield and pipe shieldModel 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustibles Listed 2100 UL HT T-BoxassemblyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 23, Figure Model 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 25, Figure Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK SECTION ALCOVE INSTALLATION AND CLEARANCES PREPARING THE STOVE FOR INSTALLATIONChimney Floor Protection 1. Convert specification to R-valueHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Alcove InstallationALCOVE INSTALLATION AND CLEARANCES any listed 2100 UL 103 HT. TYPE ChimneyModel 21 minimum clearance to combustibles 13/16” TYP 1” TYP 1/4” TYP Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield Pipe Shield Loosen these top shield screwsFINAL CHECK SECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPOSSIBLE CAUSE SECTION TROUBLESHOOTINGPROBLEM SOLUTIONPROBLEM SOLUTIONPOSSIBLE CAUSE PRODUCTS COVERED WARRANTY TIME PERIODSPROCEDURE NEW BUCK CORPORATION NBCOTHER RIGHTS CONDITIONS AND EXCLUSIONS