New Buck Corporation 21 installation instructions Final Check

Page 30
FINAL CHECK

FINAL CHECK

1.Recheck the specified clearances.

2.Remove all foreign material from the firebox area.

3.Open the primary air draft.

4.Plug the power cord into a 115V AC outlet when using with optional motor.

5.Place crumpled pieces of newspaper in the stove. Light it and close the doors. Ensure that the stove draws properly through the primary draft.

6.Check for smoke leaks around the door.

If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem, contact your dealer for assistance.

28

Image 30
Contents MODEL NON-CATALYTICUNIT MODEL NON-CATBuck Stove Page TABLE OF CONTENTS INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELREAD THIS FIRST IMPORTANT INSTRUCTIONS SECTION INTRODUCTIONMASONRY INSERT INSTALLATION SECTIONMODEL Floor Protection POSSIBLE TOOLS NEEDED FOR INSTALLATION INSTALLATION PREPARATIONMASONRY INSERT INSTALLATION OPTIONS STARTER PIPE SEAL TRIM PANELS AND UNDER AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN FRONT OF STOVE UNIT WITH INSULATION OR HIGHMOUNTING THE TRIM PANELS POSITIONING THE HEATERPOSITIONING FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION Chimney1. Convert specification to R-value Floor ProtectionPREPARING THE ROOM HEATER LOCATION HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation CHIMNEYModel 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential InstallationNOTE For minimum clearances See Page 17, Figure Model 21 minimum clearance to combustibles Without close clearance shield and pipe shield Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL NOTE For minimum clearances See Page 19, Figureany listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustiblesHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 23, Figure any listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationNOTE For minimum clearances See Page 25, Figure Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK SECTION ALCOVE INSTALLATION AND CLEARANCES PREPARING THE STOVE FOR INSTALLATIONChimney 1. Convert specification to R-value Floor ProtectionAlcove Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLALCOVE INSTALLATION AND CLEARANCES any listed 2100 UL 103 HT. TYPE ChimneyModel 21 minimum clearance to combustibles Pipe Shield Loosen these top shield screws Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEPROBLEM SOLUTIONPOSSIBLE CAUSE NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS