New Buck Corporation installation instructions Model 21 minimum clearance to combustibles

Page 17
Model 21 minimum clearance to combustibles.

A. Vertical exit using (6" Single Wall minimum 24 ga. blued or black

pipe, and any listed 2100° UL 103 HT. TYPE Chimney). Without optional close clearance shield, and pipe shield.

Model 21 minimum clearance to combustibles.

Figure 7.

Figure 8.

 

 

BACK WALL

 

CONTEMPORARY CAP

 

 

 

 

 

 

 

B

D FF

LISTED 2100° UL 103 HT

 

 

 

B

G

 

WALLSIDE

 

 

 

TYP. CHIMNEY

 

 

PROTECTOR

 

 

CAULK

 

 

 

STORM COLLAR

 

 

 

 

 

 

EE

 

 

G

FLASHING

 

A

 

 

RADIATION SHIELD

 

 

 

 

 

 

 

 

 

 

 

 

 

LISTED 2100° UL 103 HT TYP.

 

 

 

 

 

INSTALLATION

 

 

 

 

 

CEILING

CEILING SUPPORT

 

 

 

 

 

 

 

 

 

 

SINGLE WALL

 

 

 

 

 

CONNECTOR PIPE

 

CC

C

SIDE

 

 

WALL

 

 

A

B

C

D

E

F

G

 

MODEL 21

25”

13" 19" 15.5" 8"

3"

16"

NEW BUCK

BUCK STOVE

NOTE: All clearances are to combustibles without close clearance shields, and pipe shield, using 6" Single Wall minimum 24 ga. blued or black pipe , and minimum floor protector . The clearances above may be reduced. Follow NFPA-211codes if available or follow instructions on (Pages 18, and 19, or Pages 22, and 23).

15

Image 17
Contents Buck Stove MODEL NON-CATALYTICUNITMODEL NON-CAT Page TABLE OF CONTENTS READ THIS FIRST IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL INTRODUCTION SECTIONMODEL MASONRY INSERT INSTALLATIONSECTION Floor Protection MASONRY INSERT INSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION OR WIRE IT OPEN AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPERSTARTER PIPE SEAL TRIM PANELS AND UNDER FRONT OF STOVE UNIT WITH INSULATION OR HIGHPOSITIONING POSITIONING THE HEATERMOUNTING THE TRIM PANELS FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION Chimney PREPARING THE STOVE FOR INSTALLATIONFloor Protection 1. Convert specification to R-valueResidential Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLPREPARING THE ROOM HEATER LOCATION CHIMNEYModel 21 minimum clearance to combustibles NOTE For minimum clearances See Page 17, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation Model 21 minimum clearance to combustibles HOW TO LOCATE CHIMNEY EXIT, AND INSTALL Residential and Mobile Home InstallationWithout close clearance shield and pipe shield NOTE For minimum clearances See Page 19, FigureModel 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles Listed 2100 UL HT T-BoxassemblyNOTE For minimum clearances See Page 23, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Model 21 minimum clearance to combustibles any listed 2100 UL 103 HT. TYPE ChimneyNOTE For minimum clearances See Page 25, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK Chimney SECTION ALCOVE INSTALLATION AND CLEARANCESPREPARING THE STOVE FOR INSTALLATION Floor Protection 1. Convert specification to R-valueHOW TO LOCATE CHIMNEY EXIT, AND INSTALL Alcove InstallationModel 21 minimum clearance to combustibles ALCOVE INSTALLATION AND CLEARANCESany listed 2100 UL 103 HT. TYPE Chimney Installation of Optional Pipe Shield Installation of Optional Close Clearance ShieldsPipe Shield Loosen these top shield screws 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY BUILDING A FIRE SECTION OPERATIONPROBLEM SECTION TROUBLESHOOTINGSOLUTION POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION PROCEDURE WARRANTY TIME PERIODSNEW BUCK CORPORATION NBC PRODUCTS COVEREDOTHER RIGHTS CONDITIONS AND EXCLUSIONS