This section of the manual is to help you get the maximum efficiency and maximum smoke (particulate) reduction from your heater. If you should experience any difficulty or have any questions concerning your heater, contact your dealer for assistance. The manufacturer recommends that for maximum performance burn seasoned hard wood.

Build a fire for maximum efficiency. These models burn wood and extract heat so efficiently, a large fire is not necessary. A large fire not only wastes energy, it usually results in the home being too warm for comfort.

The following steps will serve as a guide for operating your stove.

BUILDING A FIRE

1.Open the door.

2.Open the primary air control under hearth, push in. To close pull all the way out.

3.Twist two pieces of non-colored newspaper into a roll and place them on the floor of the firebox.

4.These models are not designed for the use of grates, andirons or other methods of supporting the fuel.

5.Lay several pieces of dry kindling on top of the newspaper.

6.Place three or four small pieces of firewood, 2-3" in diameter, on top of the kindling.

7.Light the newspaper in the front. Close and latch the door. Don't leave the fire unattended at

this point. The draft system of the heater should start quickly. It may be necessary to preheat the chimney to get the draft started. To do this, open the door and add newspaper to the top rear of the wood. Light or let this paper ignite and allow to burn while holding the door slightly cracked. Once the draft has started, close and lock the door. You are over heating the unit if the chimney and or connector glows red.

8. After embers and a coal bed have been established, load the heater with wood.

NOTE: THE FUELING DOOR MUST REMAIN CLOSED DURING OPERATION.

NOTE: If the optional blower is being used on the Model 21 Non-Cat, operate the blower in the “OFF” position for the first thirty (30) minutes after starting the fire and in the “OFF” position for thirty (30) minutes after refueling the fire.

36

Image 38
Contents Buck Stove MODEL NON-CATALYTICUNITMODEL NON-CAT Page TABLE OF CONTENTS READ THIS FIRST IMPORTANT INSTRUCTIONS INSTALLATION, OPERATION, ANDMAINTENANCE INSTRUCTIONS MODEL SECTION INTRODUCTIONMODEL MASONRY INSERT INSTALLATIONSECTION Floor Protection MASONRY INSERT INSTALLATION OPTIONS POSSIBLE TOOLS NEEDED FOR INSTALLATIONINSTALLATION PREPARATION STARTER PIPE SEAL TRIM PANELS AND UNDER AIRTIGHT INSU LATED CLEAN OUT REMOVE DAMPEROR WIRE IT OPEN FRONT OF STOVE UNIT WITH INSULATION OR HIGHMOUNTING THE TRIM PANELS POSITIONING THE HEATERPOSITIONING FIGURE 3 MOUNTING TRIM PANELSFINAL CHECK Page SECTION PRE-FABINSERT INSTALLATION PREPARING THE STOVE FOR INSTALLATION Chimney1. Convert specification to R-value Floor ProtectionPREPARING THE ROOM HEATER LOCATION HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation CHIMNEYModel 21 minimum clearance to combustibles NOTE For minimum clearances See Page 17, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential Installation Model 21 minimum clearance to combustibles Without close clearance shield and pipe shield Residential and Mobile Home InstallationHOW TO LOCATE CHIMNEY EXIT, AND INSTALL NOTE For minimum clearances See Page 19, Figureany listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesD. Vertical Wall Exit using 6 DVL Close Clearance Pipe, and Elbow, and any Listed 2100 UL HT chimney and Listed 2100 UL HT T-Boxassembly HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly Model 21 minimum clearance to combustiblesNOTE For minimum clearances See Page 23, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation any listed 2100 UL 103 HT. TYPE Chimney Model 21 minimum clearance to combustiblesNOTE For minimum clearances See Page 25, Figure HOW TO LOCATE CHIMNEY EXIT, AND INSTALLResidential and Mobile Home Installation Listed 2100 UL HT T-Boxassembly OUT SIDE AIR INSTALLATION Page FINAL CHECK Chimney SECTION ALCOVE INSTALLATION AND CLEARANCESPREPARING THE STOVE FOR INSTALLATION 1. Convert specification to R-value Floor ProtectionAlcove Installation HOW TO LOCATE CHIMNEY EXIT, AND INSTALLModel 21 minimum clearance to combustibles ALCOVE INSTALLATION AND CLEARANCESany listed 2100 UL 103 HT. TYPE Chimney Pipe Shield Loosen these top shield screws Installation of Optional Close Clearance ShieldsInstallation of Optional Pipe Shield 13/16” TYP 1” TYP 1/4” TYPFINAL CHECK SECTION WOOD HEATER SAFETY SECTION OPERATION BUILDING A FIRESOLUTION SECTION TROUBLESHOOTINGPROBLEM POSSIBLE CAUSEPOSSIBLE CAUSE PROBLEMSOLUTION NEW BUCK CORPORATION NBC WARRANTY TIME PERIODSPROCEDURE PRODUCTS COVEREDCONDITIONS AND EXCLUSIONS OTHER RIGHTS