Heat & Glo LifeStyle XLR-N-CE manual Battery Tray/Battery Installation, After Fireplace is Lit

Page 12

K. Battery Tray/Battery Installation

The IntelliFire PlusTM system has a battery backup option. Battery longevity and performance will be affected by the service temperatures of this appliance. Batteries should only be used as a power source in the event of an emer- gency such as an outage.

L. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.E.

Clean fixed glass assembly. See Section 3.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fire- place break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

M. Frequently Asked Questions

ISSUE

SOLUTIONS

Condensation on the glass

This is a result of gas combustion and temperature variations. As the fireplace warms, this con-

densation will disappear.

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the fireplace is allowed

to burn for 20 to 40 minutes.

 

 

When first operated, this fireplace may release an odor for the first several hours. This is caused

Odor from fireplace

by the curing of materials from manufacturing. Odor may also be released from finishing materials

and adhesives used near the fireplace. These circumstances may require additional curing related

 

 

to the installation environment.

 

 

Film on the glass

This is a normal result of the curing process of the paint. Glass should be cleaned within 3 to 4

hours of initial burning. A non-abrasive cleaner such as gas appliance glass cleaner may be neces-

 

 

sary. See your dealer.

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to the

Metallic noise

sound produced by a furnace or heating duct. This noise does not affect the operation or longevity

 

of the fireplace.

 

This appliance can operated on battery power in the event of a power outage. To access the bat-

Power Outages (battery backup)

tery pack, the decorative front, mesh and glass assembly must be removed. Refer to Section 12

 

for more details.

Wall above appliance feels hot to

No action necessary. This appliance ships with a non-combustible material attached. Specifica-

the touch.

tions of the attached non-combustible material are listed in Section 1.E.

12

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 12
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and Fronts Nine Hour Safety Shutdown Feature Module Reset SwitchControl Module Operation Lighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Battery Tray/Battery Installation Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallAccess Through the Valve Assembly Gas InformationGas Pressure Requirements Gas Connection Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Setting Air Shutter SettingsMedia Options Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield Ceiling FirestopSnorkel Support Box-BlackAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information