FIREPLACE OPENING

43 cm TO 44 cm

Figure 13.4 Required Fireplace Opening Height

Note: The lower cover panel must be pushed all the way down. The outer finishing flanges should line up. The fireplace opening must be between 43 cm and 44 cm for the decorative fronts to fit correctly. See Figure 13.4.

Finish and Sealing Joints

All joints between the finished wall sheating and the appliance must be sealed with non-combustible materials. Sealants, such as caulk or mastic used to seal the gap between the wall and the fireplace, should be rated at a minimum continuous exposure to 300°

F.Wall board joints can be taped and sealed with combustible drywall tape.

Finishing Around Opening with Gypsum Wallboard

Gypsum wallboard (drywall) joints adjacent to the fireplace opening require special attention to minimize potential development of cracking. Hearth and Home Technologies recommends the following steps to minimize potential cracks in the finished drywall around the fireplace opening:

When installing gypsum wallboard around the fireplace, install the hole for the fireplace opening in a single wallboard sheet, if possible. This will minimize the joints adjacent to the fireplace opening.

The factory-supplied non-combustible board and the gypsum wallboard must join on the structural framing, where applicable. Wallboard and non-combustible board should be fastened to the framing with at least 3,2 cm long screw fasteners, located within 3,8 from each corner, and at no more than 30,5 intervals along the joint length.

The wall-board joints should be finished with a Taping Coat, followed by at least two subsequent Finish Coats of joint compound.

For the initial Taping Coat, it is critical that a general- purpose chemically hardening joint compound, such as SHEETROCK™ Brand Durabond™ Setting-Type Joint Compound, be used to fill the joint and embed the mesh tape. Fiberglass-mesh tape is recommended because it will provide a more crack-resistant joint than one finished with paper tape. Let the Taping Coat properly cure before applying subsequent Finish Coats.

For the second and third finishing coats, it is acceptable to use a light-weight joint compound and standard application, curing and sanding methods.

Do not operate the fireplace during the drywall finishing process. Allow the finish coat to cure for at least 24 hours prior to using the appliance.

Painting

If desired finishing includes a painted wall, 100% acrylic latex with compatible primer is recommend around the appliance. Oil-based or standard acrylic paints may discolor due to heat exposure.

Wallboard Joint-Crack Prevention and Repair

Wallboard joints around the fireplace will be affected by exposure to elevated temperatures, along with other en- vironmental and structural factors. The specific methods presented in the previous section will help prevent or minimize development of cracks.

If a crack does emerge adjacent the fireplace, it can be permanently repaired by filling it with spackling paste or paintable latex caulk, followed by repainting.

46

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 46
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsModule Reset Switch  Nine Hour Safety Shutdown FeatureControl Module Operation Final inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Initial Break-in Procedure Battery Tray/Battery InstallationFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Decorative DoorsFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Access Through the Valve AssemblyGas Pressure Requirements Gas Connection Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFACTORY-INST Alled Painting Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Settings Air Shutter SettingMedia Options Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow Ceiling FirestopAdapter SnorkelSupport Box-Black Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information