Heat & Glo LifeStyle XLR-N-CE, XLR-PB-CE Top Vent Horizontal Termination Venting with 1 elbow

Page 24

WARNING

Fire Risk. Explosion Risk.

Do NOT pack insulation or other combustibles between ceiling firestops.

ALWAYS maintain specified clearances around venting and firestop systems.

Install wall shield and ceiling firestops as specified.

Failure to keep insulation or other material away from vent pipe may cause fire.

Top Vent - Horizontal Termination

Venting with 1 elbow

V Minimum

H1 Maximum

90 Elbow

61,0 cm

 

 

30,5 cm

91,4 cm

 

 

61,0 cm

1,5 m

 

 

91,4 cm

2,1 m

 

 

120 cm

4,3 m

 

 

H Max. =4,3 m

V + H Max. = 12,2 m

Note: Use SLP Series components only.

H1

V1

Figure 7.3

24

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 24
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and Fronts Nine Hour Safety Shutdown Feature Module Reset SwitchControl Module Operation Lighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Battery Tray/Battery Installation Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallAccess Through the Valve Assembly Gas InformationGas Pressure Requirements Gas Connection Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Setting Air Shutter SettingsMedia Options Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield Ceiling FirestopSnorkel Support Box-BlackAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information