Heat & Glo LifeStyle XLR-PB-CE Disassemble Vent Sections, Install Decorative Ceiling Components

Page 37

D. Disassemble Vent Sections

Rotate either section (see Figure 10.7) so the seams on both pipe sections are aligned as shown in Figure 10.8.

Pull carefully to separate the pieces of pipe.

Figure 10.7 Rotate Seams for Disassembly

Figure 10.8 Align and Disassemble Vent Sections

E. Install Decorative Ceiling Components

A decorative ceiling thimble can be installed on a flat ceil- ing through which the vent passes. The decorative ceiling thimble is used to cover the firestop.

• Seal the gap between the vent pipe and firestop using high temperature (150 ºC minimum continuous exposure rating) silicone to prevent cold air infiltration.

Install the decorative ceiling thimble by sliding it up to the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be installed on a cathedral ceiling through which the vent passes.

Use a plumb-bob to mark the center line of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. Locate the hole and mark the outline of the cathedral ceiling support box on the outside roof.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 3 mm larger than the support box outline.

Lower the support box through the hole in the roof until its

bottom is at least 5,1 cm below the ceiling (Figure 10.9).

Level the support box both vertically and horizontally and temporarily tack it in place through the inside walls into the roof sheathing.

Use tin snips to cut the support box from the top corners down to the roof line and fold the resulting flaps to the roof. See Figure 10.10.

Nail the flaps to the roof AFTER running a bead of non hardening sealant between the flaps and the roof.

WARNING! Risk of Fire! Clean out ALL materials from inside the support box and complete the vertical vent run and termination.

LEVEL

CATHEDRAL CEILING

SUPPORT BOX

5,1 cm MIN. BELOW FINISHED CEILING

CUT HOLE 3 mm GREATER

IN SIZE THAN PATTERN OF

SUPPORT BOX AS IT IS

PROJECTED ONTO ROOF

LINE

Figure 10.9

Figure 10.10

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

37

Image 37
Contents What to do if you smell gas EC-87/09/058Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsModule Reset Switch  Nine Hour Safety Shutdown FeatureControl Module Operation Final inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Frequently Asked Questions Battery Tray/Battery InstallationInitial Break-in Procedure After Fireplace is LitMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Minimum Framing DimensionsMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 13,4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsMin Max Top Vent Vertical Termination Venting with 4 elbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing of an Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapGas Information Access Through the Valve AssemblyGas Pressure Requirements Gas Connection IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationJunction Cord Information Electrical Service and Repair BlowerFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting Wallboard Joint-Crack Prevention and RepairOverlap Fit Method Tonic or Martini Decorative Front Facing MaterialNon-Combustible Finish Material 0-10 cm Thick Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Settings Air Shutter SettingMedia Options Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramVent Components Diagrams SLP90- 90 Elbow SLP-45 45 ElbowExtended Heat Shield Ceiling FirestopSupport Box-Black SnorkelAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Landscape DV Appliance Service Parts#14 Valve Assembly XLR-N-CE, XLR-PB-CE Service Parts ListContact Information