Heat & Glo LifeStyle XLR-N-CE, XLR-PB-CE manual Appliance Setup, Troubleshooting, Component Access

Page 4

D. Decorative Fronts. . . . . . . . . . . . . . . . 49

14 Appliance Setup

A.

Remove Fixed Glass Assembly

. 50

B.

Remove the Shipping Materials

. 50

C.

Clean the Appliance

50

D.

Accessories

50

E.

Fixed Glass Assembly

50

F.

Install the Mesh

. 50

G. Air Shutter Setting

. 51

H. Media Options

51

15 Troubleshooting

A. IntelliFire Plus™ Ignition System. . . . . . . . . . 52

16 Component Access

A.Decorative Front and Fixed Glass Assembly Removal . . 54

B.Valve Pressure Taps. . . . . . . . . . . . . . . 54

C.Control Module Access. . . . . . . . . . . . . . . . . . . . . . . . . . . 54

D.Media Tray Removal . . . . . . . . . . . . . . . 54

E.Burner and Base Pan Removal. . . . . . . . . . . 54

F.Access Through the Valve Assembly. . . . . . . . . 55

G.Gas Valve Replacement. . . . . . . . . . . . . . 56

H.Pilot Assembly Replacement. . . . . . . . . . . . 56

17 Reference Materials

A. Appliance Dimension Diagram. . . . . . . . . . . 57

B. Vent Components Diagrams . . . . . . . . . . . . 58

C. Service Parts . . . . . . . . . . . . . . . . . . 62

D. Contact Information . . . . . . . . . . . . . . . 65

= Contains updated information.

4

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 4
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsModule Reset Switch  Nine Hour Safety Shutdown FeatureControl Module Operation Final inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Battery Tray/Battery Installation Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Access Through the Valve AssemblyGas Pressure Requirements Gas Connection Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Settings Air Shutter SettingMedia Options Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield Ceiling FirestopSnorkel Support Box-BlackAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information