Heat & Glo LifeStyle XLR-N-CE, XLR-PB-CE manual Covered Alcove Applications

Page 22

 

 

 

E

 

 

 

C

 

 

A

F

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

J

B

 

 

 

 

 

 

V B

 

 

 

 

 

V

V

B

 

 

 

 

 

 

 

 

 

i

 

 

 

 

 

 

 

 

 

 

D

V

V

G

M

X

 

 

 

A

 

V

 

 

 

 

 

 

H OR i

 

 

O

 

 

 

V

 

 

 

 

 

 

N

 

 

 

 

P

 

 

 

 

K

 

L

K

 

 

 

 

 

 

 

 

 

 

R

 

 

 

 

V

Electrical

V

 

 

 

 

 

Service

 

 

 

 

 

 

 

 

 

 

C

Q

V

(See Note 2)

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

 

V

= VENT TERMINAL

X = AIR SUPPLY INLET

A

=

31 cm

clearances above grade, veranda,

 

 

 

(See Note 1)

porch, deck or balcony

B

=

31 cm

clearances to window or door

 

 

 

 

that may be opened, or to perma-

 

 

 

 

nently closed window. (Glass)

C

=

46 cm

vertical clearance to unventilated

 

 

 

 

soffit or to ventilated soffit located

 

 

 

 

above the terminal

 

 

 

76 cm

for vinyl clad soffits and below

 

 

 

 

electrical service

D

=

23 cm

clearance to outside corner

E

=

15 cm

clearance to inside corner

F

=

91 cm

not to be installed above a gas

 

 

 

 

meter/regulator assembly within 3

 

 

 

 

feet (90 cm) horizontally from the

 

 

 

 

center-line of the regulator

G

=

1,8 m

clearance to gas service regulator

 

 

 

 

flue outlet

H

=

31 cm

clearance to non-mechanical

 

 

 

(See Note 2)

air supply inlet to building or the

 

 

 

 

combustion air inlet to any other

 

 

 

 

appliance

i

=

1,8 m

clearance to a mechanical (pow-

 

 

 

(See Note 2)

ered) air supply inlet

**a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

***only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

Note 1: On private property where termination is less than 2.1 m above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page)

Note 2: Termination in a covered alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be .91 m minimum between termination caps. 2. All mechanical air intakes within 3 m of a termination cap must be a minimum of .91 m below the termination cap. 3. All gravity air intakes within .91 m of a termination cap must be a minimum of .30 m below the termination cap.

Figure 6.3 Minimum Clearances for Termination

= AREA WHERE TERMINAL IS NOT PERMITTED

J**

=

2.13 m

clearance above paved

 

 

(See Note 1)

sidewalk or a paved driveway

 

 

 

located on public property

K

=

15 cm

clearance from sides of electri-

 

 

(See Note 5)

cal service

L

=

31 cm

clearance above electrical

 

 

(See Note 5)

service

Covered Alcove Applications

M*** =

46 cm

clearance under veranda, porch,

 

 

 

deck, balcony or overhang

 

 

107 cm

vinyl

 

 

N

=

15 cm

non-vinyl sidewalls

 

 

31 cm

vinyl sidewalls

O

=

46 cm

non-vinyl soffit and overhang

 

 

107 cm

vinyl soffit and overhang

P

=

2.4 m

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

RMAX

 

 

1 cap

91 cm

2 x Q ACTUAL

 

 

2 caps

1,8 m

1 x Q ACTUAL

 

 

3 caps

2,7 m

2/3 x Q ACTUAL

 

 

4 caps

3,7 m

1/2 x Q ACTUAL

 

 

 

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

Note 3: Local codes or regulations may require different clearances.

Note 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

Note 5: Location of the vent termination must not interfere with access to the electrical service.

Vent system termination is NOT permitted in screened porches.

Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.

Heat & Glo assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

22

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 22
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideComponent Access Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsModule Reset Switch  Nine Hour Safety Shutdown FeatureControl Module Operation Final inspection by Lighting Instructions IPIAGE 110/120 VAC or 220/240 Initial Break-in Procedure Battery Tray/Battery InstallationFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Decorative DoorsFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection Control Compartment and Firebox TopGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantels Combustible/Non-Combustible Mantel and Wall ProjectionsMantel Leg Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Information Access Through the Valve AssemblyGas Pressure Requirements Gas Connection Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationFraming and Finishing Instructions Non-Combustible Materials SpecificationFinishing Finishing InstructionsFACTORY-INST Alled Painting Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Air Shutter Settings Air Shutter SettingMedia Options Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow Ceiling FirestopAdapter SnorkelSupport Box-Black Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information