Heat & Glo LifeStyle XLR-PB-CE SLP-45 45 Elbow, SLP90- 90 Elbow, Extended Heat Shield, Support

Page 59

B. Vent Components Diagrams (continued)

 

16,5 cm

16,5 cm

16,5 cm

 

22,2 cm

23,5 cm

 

 

15,2 cm

16,8 cm

 

SLP-45 - 45° Elbow

16,8 cm

 

 

25,1 cm

 

SLP90- 90° Elbow

 

 

 

 

Effective Height/Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipe

cm

mm

Effective

 

SLP4

10,2

102

Height/

 

 

 

 

 

SLP6

15,2

152

Length

 

 

 

 

 

SLP12

30,5

305

 

 

 

 

 

 

 

 

SLP24

61

610

 

 

 

 

 

 

 

 

 

 

 

SLP36

91,4

914

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLP48

121,9

1219

 

 

 

 

 

 

 

 

 

 

SLP-PIPE

SLP6A

5 - 15

51-152

 

 

 

SLP12A

5 - 30

51-305

 

 

 

 

66,0 cm

DVP-HSM-B

Extended Heat Shield

SLP-HVS

SLP-FS

SLP-WS

Horizontal Pipe

Ceiling Firestop

Wall Shield Firestop

Support

 

 

Figure 17.3 SLP Series Vent Components

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

59

Image 59
Contents What to do if you smell gas EC-87/09/058Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting Component AccessLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation  Nine Hour Safety Shutdown FeatureModule Reset Switch AGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by After Fireplace is Lit Battery Tray/Battery InstallationFrequently Asked Questions Initial Break-in ProcedureDecorative Doors Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningControl Compartment and Firebox Top Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Minimum Framing DimensionsMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 13,4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsMin Max Top Vent Vertical Termination Venting with 4 elbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing of an Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components 17 Venting through the wall Install Horizontal Termination CapGas Pressure Requirements Gas Connection Access Through the Valve AssemblyGas Information Optional Remote Control Receiver and Battery Pack Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsJunction Cord Information Electrical Service and Repair BlowerFinishing Instructions Non-Combustible Materials SpecificationFinishing Framing and Finishing InstructionsFACTORY-INST Alled Wallboard Joint-Crack Prevention and Repair Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard PaintingOverlap Fit Method Tonic or Martini Decorative Front Facing MaterialNon-Combustible Finish Material 0-10 cm Thick Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Media Options Air Shutter SettingAir Shutter Settings IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Component Access Valve Assembly Gasket Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramVent Components Diagrams Ceiling Firestop SLP-45 45 ElbowSLP90- 90 Elbow Extended Heat ShieldBlack 30,5 cm 17,8 cm 39,4 cm SnorkelSupport Box-Black AdapterSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Landscape DV Appliance Service Parts#14 Valve Assembly XLR-N-CE, XLR-PB-CE Service Parts ListContact Information