Heat & Glo LifeStyle XLR-PB-CE, XLR-N-CE manual Appliance Preparation, Top Vent

Page 33

9 Appliance Preparation

A. Top Vent

CAUTION! Risk of Cuts, Abrasions or Flying Debris.

Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

ELBOW HEAT SHIELD SHOWN

IN SHIPPING POSITION

Figure 9.1 Elbow Shield Shown as Shipped

If venting with a 90 degree elbow directly off of the top of the appliance, the elbow heat shield must be repositioned as shown in Figure 9.2.

If venting vertically or using a straight section of vertical pipe, remove the elbow heat shield and discard by remov- ing the two 1/4 in. screws that secure the elbow heat shield to the top of the fireplace.

For all venting applications, ensure that the pipe gasket is in place before attaching any pipe section. This gasket is shipped in place around the starting collar. See Figure 9.2.

ELBOW HEAT SHIELD

SHOWN AS INSTALLED

PIPE GASKET

Figure 9.2 Elbow Shield Shown Installed

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

33

Image 33
Contents What to do if you smell gas EC-87/09/058Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and Fronts Nine Hour Safety Shutdown Feature Module Reset SwitchControl Module Operation Lighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Battery Tray/Battery InstallationInitial Break-in Procedure After Fireplace is LitMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Minimum Framing DimensionsMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 13,4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsMin Max Top Vent Vertical Termination Venting with 4 elbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing of an Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapAccess Through the Valve Assembly Gas InformationGas Pressure Requirements Gas Connection IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationJunction Cord Information Electrical Service and Repair BlowerFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting Wallboard Joint-Crack Prevention and RepairOverlap Fit Method Tonic or Martini Decorative Front Facing MaterialNon-Combustible Finish Material 0-10 cm Thick Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Air Shutter SettingsMedia Options Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramVent Components Diagrams SLP90- 90 Elbow SLP-45 45 ElbowExtended Heat Shield Ceiling FirestopSupport Box-Black SnorkelAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Landscape DV Appliance Service Parts#14 Valve Assembly XLR-N-CE, XLR-PB-CE Service Parts ListContact Information