WARNING! Risk of Fire! Maintain specified air space clearances to combustibles. Failure to comply with these instructions may cause a fire or cause the appliance to overheat.

PILOT HOLES (11) TO ATTACH NON-

COMBUSTIBLE BOARD TO FRAMING

FACTORY-INSTALLED

NON-COMBUSTIBLE BOARD

LOWER COVER PANEL

= 2,5 cm MAX. SELF-TAPPING SCREWS ALLOWED

= NO SCREWS ALLOWED

= 13 cm – 18 cm SELF-TAPPING SCREWS ALLOWED

NOTE: It is acceptable to use a high temperature (150 °C minimum continuous exposure silicone sealant to ad- here drywall to lower cover panel.

Figure 13.3 Finishing Details

Note: Refer to Section 13.C regarding installation details as- sociated with the Inside and Overlap Fit methods.

CAUTION! Risk of Glass Damage and Cuts! DO NOT drill or install any type of screw or fastener into the lower cover panel. Sharp screw or fastener tips may penetrate and break the glass or cause cuts.

The XLR-CE must be finished using either the Tonic or Martini decorative fronts. See Figures 13.11 and 13.12. The final fireplace installation can be accomplished by ei- ther the Overlap Fit or Inside Fit method. Reference Sec- tion 13.C regarding installation details associated with the Inside Fit and Overlap Fit methods.

It is acceptable to pre-drill holes and use self-tapped screws in the factory-installed non-combustible board to attach non-combustible backer board for tile, marble, etc. Refer to Figure 13.3 for acceptable screw location and screw length requirements.

Self-tapping screws up to 2,5 cm long can be installed through the nailing tab and outer 4,5 cm edges of the factory-installed non-combustible board to secure the drywall adjacent to the factory-installed non-combustible board. See Figure 13.3.

Do not drill or install screws which may penetrate the low- er cover panel as this will restrict required access to the glass, battery-back-up, and remote receiver. See Figure 13.3.

The appliance is designed to accept 1,3 cm wall sheath- ing materials such as drywall, plywood, wood composites, or non-combustible materials. The type of material used depends whether the installation is an Inside or Overlap Fit Method. Refer to Section 13.C regarding installation details associated with the Inside an Overlap Fit meth- ods.

The factory-supplied non-combustible board must be used in all installations. It must be directly attached to structural framing adjacent to the appliance. Screw fas- teners should be installed in the pilot holes provided in the outer perimeter of the non-combustible board. See Figure 13.3.

The factory-supplied board is designed such that its edg- es will be at the approximate center of the adjacent fram- ing, assuming it is 1-1/2 in. (3,8 cm) nominal thickness. This will allow the wallboard joints to occur on the center of the framing where the panels can be fastened prop- erly. If the framing thickness is less than 1-1/2 in. (3,8 cm) nominal, such as with formed steel systems, then it may be necessary to adjust the adjacent framing dimensions so that the non-combustible board and wallboard joints are centered on the framing.

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

45

Image 45
Contents What to do if you smell gas EC-87/09/058Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupComponent Access Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and Fronts Nine Hour Safety Shutdown Feature Module Reset SwitchControl Module Operation Lighting Instructions IPI Final inspection byAGE 110/120 VAC or 220/240 Frequently Asked Questions Battery Tray/Battery InstallationInitial Break-in Procedure After Fireplace is LitMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Decorative DoorsGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianFirebox Control Compartment and Firebox TopTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Minimum Framing DimensionsMantel and Wall Projections Mantels Combustible/Non-CombustibleMantel Leg Combustible/Non-Combustible Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Vent Information and Diagrams Minimum Maximum Top Vent Horizontal Termination Venting with 1 elbowTop Vent Horizontal Termination Venting with 2 elbows Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 13,4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsV1 Minimum H1 + H2 Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 3 elbowsMin Max Top Vent Vertical Termination Venting with 4 elbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing of an Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapAccess Through the Valve Assembly Gas InformationGas Pressure Requirements Gas Connection IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationJunction Cord Information Electrical Service and Repair BlowerFinishing Non-Combustible Materials SpecificationFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finishing Around Opening with Gypsum Wallboard Finish and Sealing JointsPainting Wallboard Joint-Crack Prevention and RepairOverlap Fit Method Tonic or Martini Decorative Front Facing MaterialNon-Combustible Finish Material 0-10 cm Thick Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Air Shutter Setting Air Shutter SettingsMedia Options Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Ues to spark, and main Component Access Valve Assembly Gasket Pilot Assembly Replacement Gas Valve ReplacementReference Materials Appliance Dimension DiagramVent Components Diagrams SLP90- 90 Elbow SLP-45 45 ElbowExtended Heat Shield Ceiling FirestopSupport Box-Black SnorkelAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Landscape DV Appliance Service Parts#14 Valve Assembly XLR-N-CE, XLR-PB-CE Service Parts ListContact Information