D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Mantels (Combustible/Non-Combustible)

1,3 cm Thick Wall

Sheathing 30 cm

MAX.

MEASUREMENT

36 cm FROM TOP OF MIN. FIREPLACE

OPENING

Figure 5.3 Clearances To Combustible/Non-Combustible

Mantels Or Other Combustibles/Non-Combust-

ibles Above Appliance.

Note: For non-combustible fireplace finish material (marble, stone, etc) specifications refer to Section 13.C.

Mantel Leg (Combustible/Non-Combustible)

TOP VIEW

8 cm

MINIMUM UNLIMITED

18 cm

Figure 5.4 Non-Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

2,5 cm

FRAMING

NAILING TAB

1,2 cm FACTORY-SUPPLIED

NON-COMBUSTIBLE BOARD

Figure 5.5 Front Side Finishing Detail

8,90 cm

NON-COMBUSTIBLE

BOARD SHIPPED

WITH APPLIANCE

2,5 cm

2,5 cm

AIR SPACE

Figure 5.6 Non-Combustible Zone

Note: AIR SPACE denoted in Figure 5.6 is defined by the nailing tabs and metal standoffs.

Note: Factory installed non-combustible board may only be replaced with HHT product code SUPERM-60material and must be fully replaced in its entirety.

20

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 20
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsControl Module Operation  Nine Hour Safety Shutdown FeatureModule Reset Switch AGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by Battery Tray/Battery Installation Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the wallGas Pressure Requirements Gas Connection Access Through the Valve AssemblyGas Information Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Media Options Air Shutter SettingAir Shutter Settings IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield Ceiling FirestopSnorkel Support Box-BlackAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information