Heat & Glo LifeStyle XLR-N-CE manual Install Attic Insulation Shield, Flat Ceiling Installation

Page 32

D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 2,54 cm bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

BEND ALL TABS INWARD 90°

TO MAINTAIN CLEARANCE

AND PREVENT INSULATION

FROM FALLING INSIDE

 

BEND 3 TABS

 

OUTWARD TO

 

FASTEN TO CEILING

 

FIRESTOP-BEND

 

REMAINING TABS

 

INWARD 90 DEGREES

 

TO MAINTAIN

INSERT 3

CLEARANCE

 

SCREWS

 

Figure 8.5 Attic Insulation Shield

32

Heat & Glo • XLR-N-CE, XLR-PB-CE2198-900 Rev. J • 5/12

Image 32
Contents EC-87/09/058 What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingComponent Access Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsControl Module Operation  Nine Hour Safety Shutdown FeatureModule Reset Switch AGE 110/120 VAC or 220/240 Lighting Instructions IPIFinal inspection by Battery Tray/Battery Installation Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Decorative DoorsMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionFirebox Control Compartment and Firebox TopGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesMantel Leg Combustible/Non-Combustible Mantel and Wall ProjectionsMantels Combustible/Non-Combustible Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Minimum MaximumTop Vent Horizontal Termination Venting with 2 elbows Top Vent Vertical Termination No Elbows V1 = 13,4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 4 elbows Min MaxVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing of anInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the wallGas Pressure Requirements Gas Connection Access Through the Valve AssemblyGas Information Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver and Battery Pack LocationElectrical Service and Repair Blower Junction Cord InformationNon-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsFACTORY-INST Alled Finish and Sealing Joints Finishing Around Opening with Gypsum WallboardPainting Wallboard Joint-Crack Prevention and RepairFacing Material Overlap Fit Method Tonic or Martini Decorative FrontNon-Combustible Finish Material 0-10 cm Thick Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Media Options Air Shutter SettingAir Shutter Settings IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Component Access Valve Assembly Gasket Gas Valve Replacement Pilot Assembly ReplacementAppliance Dimension Diagram Reference MaterialsVent Components Diagrams SLP-45 45 Elbow SLP90- 90 ElbowExtended Heat Shield Ceiling FirestopSnorkel Support Box-BlackAdapter Black 30,5 cm 17,8 cm 39,4 cmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts Landscape DV Appliance#14 Valve Assembly Service Parts List XLR-N-CE, XLR-PB-CEContact Information