Heat & Glo LifeStyle CERONA-42, CERONA-36 Alcove Applications, Minimum Clearances for Termination

Page 12

R

M

N

P

Q

(See Note 2)

V

T

VS Electrical S

Service

D*

V

V

V

= VENT TERMINAL

X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

12 inches

clearances above grade, veranda,

L**

=

.7 ft

clearance above paved

 

 

(See Note 1)

porch, deck or balcony

 

 

 

 

(See Note 1)

 

sidewalk or a paved driveway

B

=

12 inches

clearances to window or door

 

 

 

 

 

 

 

 

located on public property

M*** =

18 inches

clearance under veranda, porch,

 

 

 

that may be opened, or to perma-

 

 

 

nently closed window. (Glass)

 

 

 

 

 

 

 

 

deck, balcony or overhang

D*

=

18 inches

vertical clearance to unventilated

 

 

 

 

42 inches

vinyl

 

 

 

 

 

 

soffit or to ventilated soffit located

S

=

 

6 inches

clearance from sides of electri-

 

 

 

above the terminal

 

 

 

 

 

(See Note 5)

 

cal service

 

 

 

 

 

*30 inches

for vinyl clad soffits and below

T

=

12 inches

clearance above electrical

 

 

 

electrical service

 

 

 

 

(See Note 5)

 

service

 

 

 

F

=

9 inches

clearance to outside corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alcove Applications

 

 

 

 

 

G

=

6 inches

clearance to inside corner

 

 

 

 

 

 

 

 

 

N

 

=

6 inches

non-vinyl sidewalls

 

H

=

3 ft. (Canada)

not to be installed above a gas

 

 

 

 

 

 

 

 

 

12 inches

vinyl sidewalls

 

 

 

 

meter/regulator assembly within 3

 

 

 

 

 

 

 

 

 

 

 

P

 

=

8 ft.

 

 

 

 

 

 

 

 

 

feet (90 cm) horizontally from the

 

 

 

 

 

 

 

 

 

 

 

 

center-line of the regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

 

RMAX

 

 

I

=

3 ft

clearance to gas service regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 cap

 

3 feet

 

2 x Q ACTUAL

 

 

 

 

 

vent outlet

 

 

 

 

 

 

 

 

J

=

9 inches (U.S.A.)

 

 

 

 

 

2 caps

 

6 feet

 

1 x Q ACTUAL

 

 

 

 

12 inches (Canada) clearance to non-mechanical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 caps

 

9 feet

 

2/3 x Q ACTUAL

 

 

 

 

 

air supply inlet to building or the

 

 

 

 

 

 

 

 

 

 

 

combustion air inlet to any other

 

 

 

 

4 caps

 

12 feet

 

1/2 x Q ACTUAL

 

 

 

 

 

appliance

 

 

 

 

 

 

 

 

 

 

 

 

 

K

=

3 ft. (U.S.A.)

 

 

 

QMIN

= # termination caps x 3

RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

 

 

 

 

 

 

6 ft. (Canada)

clearance to a mechanical (pow-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ered) air supply inlet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

***only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

Note 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page)

Note 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for

vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.

Figure 4.4 Minimum Clearances for Termination

Note 3: Local codes or regulations may require different clearances.

Note 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

Note 5: Location of the vent termination must not interfere with access to the electrical service.

WARNING: In the U.S: Vent system termination is NOT permitted in screened porches. You must follow side wall, overhang and ground clearances as stated in the instructions.

In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.

Heat & Glo assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.

12

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

Image 12 Contents
Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsInstallation to ensure maximum safety and benefit Getting StartedTools and Supplies Needed Read all of the instructions before starting the instaFraming and Clearances Selecting Appliance Location Constructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Vent Information and Diagrams Vent Table KeyUse of Elbows Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows Top Vent Horizontal Termination Three Elbows Top Vent Vertical Termination Straight up Vertical VentingV1 = 50 ft. Max .2 m 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationDiagram shows .2 the location of the nailing tabs Securing and Leveling the ApplianceProvided to secure the appliance to the framing members Installing Flue Restrictors Complete Installation of Non-combustible Facing MaterialInstalling Vent Pipe Assembly of Vent SectionsAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsDisassembly of Vent Sections Securing the Vent SectionsVertical Sections Horizontal SectionsInstalling Heat Shield and Horizontal Termination Cap Installing the Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Recommendation for Wire Intellifire Ignition System WiringConnecting to the Appliance Optional Accessories RequirementsNot operate unless Properly groundedJunction Box Installation Junction Box DetailStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Options Finishing Material Thickness from 3/4 in. to 1-1/4Finishing Material Thickness greater than 1-1/4 inch Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Appliance Setup Clean the ApplianceAccessories Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List At DepotIPI Valve Assembly StockedCERONA-42 CERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint KitIPI Valve Assembly Limited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information
Related manuals
Manual 62 pages 22.54 Kb Manual 1 pages 2.44 Kb