Heat & Glo LifeStyle CERONA-42, CERONA-36 owner manual Step

Page 34

Note TO APPLIANCE INSTALLERS:

To protect appliance after installation, but before use, please replace corrugated splatterguard on unit per directions noted below.

STEP 1

For Cerona-36, center left to right over glass and fold top center section under top heat shield as in figure 1. For Cerona-42, center left to right over glass and fold top three center sections under top heat shield.

Figure 1.

STEP 2

On the Cerona-36 model, place outside tabs over top heat shield and behind arched opening. For Cerona-42, place outer left and right tabs over top heat shield and behind arched opening. Figure 2 illustrates placement of outer center section and outer tabs over and under top heat shield on Cerona-42. The splatter guard must be inserted until tabs are engaged behind arched steel opening for both models.

Figure 2.

STEP 3

Push in folded bottom tab over control module heat shield, placing lower outside notches on glass support brackets. See Figure 3 and 4.

Figure 3.

Figure 4.

34

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

Image 34 Contents
Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsTop Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationSecuring and Leveling the Appliance Diagram shows .2 the location of the nailing tabsProvided to secure the appliance to the framing members Installing Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeFuel Conversions Gas Connection Gas InformationGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Optional Accessories RequirementsNot operate unless Properly groundedJunction Box Installation Junction Box DetailStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Air Shutter Setting Glass AssemblyGrilles and Trim Before Lighting Appliance Operating InstructionsThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Intellifire Ignition System TroubleshootingSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsReference Materials Appliance Dimension DiagramModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Service Parts Log Set AssemblyPart number list on following Service Parts List At DepotIPI Valve Assembly StockedCERONA-42 CERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint KitIPI Valve Assembly Limited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information
Related manuals