Heat & Glo LifeStyle CERONA-36, CERONA-42 After Appliance is Lit, Frequently Asked Questions

Page 47

C. After Appliance is Lit

Initial Break-in Procedure

When you light the appliance, you may notice that it pro- duces heat which does have an associated odor or smell. If you feel this odor is excessive it may require the initial three to four hour continuous burn on high followed by a second burn up to 12 hours to fully drive off any odor from paint and lubricants used in the manufacturing process. Condensation of the glass is normal.

Note: The appliance should be run three to four hours on the initial start-up. Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the appliance for an additional 12 hours. This will help to cure the products used in the paint and logs.

During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the appliance’s initial burning.

WARNING

Fire Risk.

High Temperatures.

Keep combustible household items away from appliance.

Do NOT obstruct combustion and ventilation air.

Do NOT place combustible items on top of or in front of appliance.

Keep furniture, draperies away from appliance.

CAUTION

Prevent accidental appliance operation when not attended.

Unplug or remove batteries from remote control if absent or if appliance will not be used for an extended period of time.

Property damage possible from elevated temperatures.

CAUTION

Smoke and odors released during initial operation.

Open windows for air circulation.

Leave room during initial operation.

Smoke may set off smoke detectors.

Smoke and odors may be irritating to sensitive individuals.

WARNING

Fire Hazard.

Keep combustible materials, gasoline and other flammable vapors and liquids clear of appliance.

Do NOT store flammable materials in the appliance’s vicinity.

• Do NOT use gasoline, lantern fuel, kerosene, charcoal lighter fluid or similar liquids in this appliance.

• Combustible materials may ignite.

D. Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the appliance warms, this

condensation will disappear.

 

 

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the appliance is al-

lowed to burn for 20 to 40 minutes.

 

 

 

 

When first operated, this appliance may release an odor for the first several hours. This is

Odor from appliance

caused by the curing of the paint and the burning off of any oils remaining from manufactur-

ing. Odor may also be released from finishing materials and adhesives used around the

 

 

appliance.

 

 

 

This is a normal result of the curing process of the paint and logs. Glass should be cleaned

Film on the glass

within 3 to 4 hours of initial burning to remove deposits left by oils from the manufacturing

 

process. A non-abrasive cleaner such as gas fireplace glass cleaner may be necessary. See

 

your dealer.

 

 

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to

Metallic noise

the sound produced by a furnace or heating duct. This noise does not affect the operation or

 

longevity of the appliance.

 

 

Is it normal to see the pilot flame burn

In an Intellifire ignition system it is normal to see the pilot flame, but it should turn off when

continually?

ON/OFF is turned off. In a standing pilot system the pilot will always stay on.

 

 

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

47

Image 47 Contents
What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies NeededSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblyProvided to secure the appliance to the framing members Diagram shows .2 the location of the nailing tabsSecuring and Leveling the Appliance Complete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Optional Accessories Requirements Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceProperly grounded Not operate unlessJunction Box Detail Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting This appliance has an Intellifire ignition system Operating InstructionsBefore Lighting Appliance Final inspection by Lighting Appliance IPI IgnitionAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksModel Cerona-36 Model Cerona-42 Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve AssemblyCERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint Kit CERONA-42IPI Valve Assembly Limited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyContact Information
Related manuals
Manual 62 pages 22.54 Kb Manual 1 pages 2.44 Kb