Heat & Glo LifeStyle CERONA-42, CERONA-36 owner manual Model Cerona-42

Page 42

Model: Cerona-42

Log Assembly: LOGS-Cerona42

If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the following instructions.

CAUTION: Carefully remove the logs from the packaging. Logs are fragile!

 

5

 

1

 

 

 

4

 

2

6

 

 

3

 

 

 

Figure 12.12

STEP 1. LOG #1 (SRV2107-701):

Place log #1 over the back side of the burner plate and slide forward until log hits the grate. Log cut out should fit over pilot bracket. See Figure 12.13.

1

Figure 12.13

STEP 2. LOG #2 (SRV2107-702):

Fit log #2 on the right side of the grate. The log is formed so it will sit around the right grate bar. Rest the top of the log on the flat section of log #1. See Figure 12.14

2

FORM FITTED

TO GRATE TINE

Figure 12.14

2107-935

42

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

Image 42 Contents
Models What to do if you smell gasHomeowner Reference Information Model Number Serial NumberTable of Contents Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsTools and Supplies Needed Installation to ensure maximum safety and benefitGetting Started Read all of the instructions before starting the instaFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel Projections 724 425 406 279Hearth Extension Dimensions Hearth ExtensionTermination Locations Vent Termination Minimum ClearancesAlcove Applications Minimum Clearances for TerminationInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components Use of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsVent Diagrams Top Vent Horizontal Termination One ElbowTwo Elbows V1 = 50 ft. Max .2 m Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting 152 mm 914 mm 305 mm 610 mm 10 ftTop Vent Horizontal Termination Two Elbows 305 mm 610 mm 914 mm 10 ftWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstalling the Ceiling Firestop Installing Attic ShieldVertical Penetration Framing Removing Non-combustible Facing Mate- rial Assembly Appliance PreparationDiagram shows .2 the location of the nailing tabs Securing and Leveling the ApplianceProvided to secure the appliance to the framing members Installing Flue Restrictors Complete Installation of Non-combustible Facing MaterialAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsVertical Sections Disassembly of Vent SectionsSecuring the Vent Sections Horizontal SectionsHeat Shield Requirements for Horizontal Termination Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat shield DVP-HSM-B must be usedInstalling Roof Flashing and Vertical Ter- mination Cap flue of the pipe see FigureAssembling and Installing Storm Collar 18 Assembling the Storm Collar Around the PipeGas Information Fuel Conversions Gas ConnectionGas Pressures High Altitude Installations Connecting to the Appliance Recommendation for WireIntellifire Ignition System Wiring Optional Accessories RequirementsNot operate unless Properly groundedJunction Box Installation Junction Box DetailStep Finishing Facing Material Non-combustible Facing MaterialFinishing Material Thickness greater than 1-1/4 inch Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 10 Fireplace sitting on combustible surface Accessories Appliance SetupClean the Appliance Ember PlacementLog Assembly LOGS-Cerona36 Positioning the Logs Model Cerona-36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Glass Assembly Air Shutter SettingGrilles and Trim Operating Instructions Before Lighting ApplianceThis appliance has an Intellifire ignition system Lighting Appliance IPI Ignition Final inspection byFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Intellifire Ignition SystemSympton Possible Cause Corrective Action Symptom Possible Cause Corrective Action Maintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsModel Cerona-36 Model Cerona-42 Vent Components Diagrams DVP vent componentsDVP-TRAP COOL-ADD Not for use with these models Log Set Assembly Service PartsPart number list on following Service Parts List At DepotIPI Valve Assembly StockedCERONA-42 CERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint KitIPI Valve Assembly Limited Lifetime Warranty Limited Lifetime Warranty Heat & GLO GAS Appliance ProductsContact Information
Related manuals
Manual 62 pages 22.54 Kb Manual 1 pages 2.44 Kb