2. Top Vent - Horizontal Termination

- (continued)

 

 

 

 

 

Two Elbows

V1 Minimum

H1 Maximum

Cerona-36 ONLY 1/2 ft

152 mm

2 ft

 

610 mm

 

 

 

1 ft

305 mm

2 ft

 

610 mm

 

2 ft

610 mm

5 ft

 

1.5 m

 

3 ft

914 mm

8 ft

 

2.4 m

 

4 ft

 

1.2 m

11 ft

 

3.4 m

V2

5 ft

 

1.5 m

14 ft

 

4.3 m

6 ft

 

1.8 m

17 ft

 

5.2 m

 

7 ft

 

2.1 m

20 ft

 

6.1 m

 

8 ft

 

2.4 m

23 ft

 

7.0 m

 

H1

= 23 ft. (7.0 m) Maximum

 

V1 + V2+ H1 = 63 ft. (19.2 m) Maximum

H1

V1

 

 

 

 

 

Note: Must have

Minimal Vertical Vent

 

 

a minimum verti-

Model

 

ft.

mm

 

cal vent before

 

 

Cerona-36

1/2

152

 

attaching a 90º

 

elbow to the unit.

Cerona-42

1

305

 

See chart.

 

 

 

 

 

Figure 5.7

Three Elbows

V2

H1

H2

INSTALLED

HORIZONTALLY

 

 

 

V1 Minimum

 

H1 Maximum

Cerona-36 ONLY

1/2 ft

152 mm

 

3 ft

 

 

914 mm

 

 

 

1 ft

305 mm

 

4 ft

 

 

1.2 m

 

 

 

2 ft

610 mm

 

7 ft

 

 

2.1 m

 

 

 

3 ft

914 mm

 

10 ft

 

 

 

3.0 m

 

 

 

4 ft

1.2 m

 

13

 

 

4.0 m

 

 

 

5 ft

1.5 m

 

16

 

 

4.9 m

 

 

 

6 ft

1.8 m

 

17

 

 

5.2 m

 

 

 

7 ft

2.1 m

 

22

 

 

6.7 m

 

 

 

H1

+ H2

= 22 ft. (6.7 m) Max.

 

 

 

V1+ V2 + H1 + H2 = 62 ft. (18.9 m) Max.

 

 

 

 

 

 

 

 

Note: Must have

Minimal Vertical Vent

 

 

a minimum verti-

Model

 

 

ft.

 

mm

 

 

cal vent before

 

 

 

 

 

Cerona-36

 

1/2

 

152

 

 

attaching a 90º

 

 

 

 

elbow to the unit.

Cerona-42

 

1

 

 

305

 

 

See chart.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V1

 

 

 

 

 

 

 

 

 

 

Figure 5.8

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

17

Image 17 Contents
What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Installation to ensure maximum safety and benefitTools and Supplies Needed Read all of the instructions before starting the instaSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove Applications Continue Adding Vent Components Install Support Brackets To Install the Heat Shield Vent Table Key Vent Information and DiagramsUse of Elbows Measuring StandardsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Top Vent Vertical Termination Straight up Vertical Venting Top Vent Horizontal Termination Three ElbowsV1 = 50 ft. Max .2 m 152 mm 914 mm 305 mm 610 mm 10 ft305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblyProvided to secure the appliance to the framing members Diagram shows .2 the location of the nailing tabsSecuring and Leveling the Appliance Complete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembly of Vent Sections Installing Vent PipeAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsSecuring the Vent Sections Disassembly of Vent SectionsVertical Sections Horizontal SectionsInstalling the Horizontal Termination Cap Installing Heat Shield and Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Heat shield DVP-HSM-B must be usedflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Intellifire Ignition System Wiring Recommendation for WireConnecting to the Appliance Optional Accessories RequirementsProperly grounded Not operate unlessJunction Box Detail Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material OptionsFinishing Material Thickness greater than 1-1/4 inch Mounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-4210 Fireplace sitting on combustible surface Clean the Appliance Appliance SetupAccessories Ember PlacementPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting This appliance has an Intellifire ignition system Operating InstructionsBefore Lighting Appliance Final inspection by Lighting Appliance IPI IgnitionAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksModel Cerona-36 Model Cerona-42 Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve AssemblyCERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint Kit CERONA-42IPI Valve Assembly Limited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyContact Information
Related manuals
Manual 62 pages 22.54 Kb Manual 1 pages 2.44 Kb