Heat & Glo LifeStyle CERONA-36 Termination Locations, Vent Termination Minimum Clearances

Page 11

4 Termination Locations

A. Vent Termination Minimum Clearances

HORIZONTAL OVERHANG

WARNING

Fire Risk. Explosion Risk.

Inspect external vent cap regularly.

Ensure no debris blocks cap.

Combustible materials blocking cap may ignite.

Restricted air flow affects burner operation.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

WARNING

Fire Risk. Explosion Risk.

Maintain vent clearance to combustibles as specified.

Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fire.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.2 Minimum height from roof to lowest discharge opening

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 4.4 for specific clearances)

Figure 4.1

Figure 4.2 specifies minimum vent heights for various pitched roofs.

GAS, WOOD OR FUEL

 

OIL TERMINATION

B

 

GAS

CTERMINATION

A

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

B

20 in.

24 in. min.

Distance to perpendicular wall

C

18 in.

18 in.

Vertical distance between terminations

Figure 4.3 Multiple Vertical Termination

Heat & Glo • Cerona-36, Cerona-422106-900 Rev. F • 04/08

11

Image 11 Contents
What to do if you smell gas ModelsModel Number Serial Number Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsRead all of the instructions before starting the insta Installation to ensure maximum safety and benefitGetting Started Tools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance Chase724 425 406 279 Mantel ProjectionsHearth Extension Hearth Extension DimensionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Alcove ApplicationsContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield Measuring Standards Vent Information and DiagramsVent Table Key Use of ElbowsTwo Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow 152 mm 914 mm 305 mm 610 mm 10 ft Top Vent Horizontal Termination Three ElbowsTop Vent Vertical Termination Straight up Vertical Venting V1 = 50 ft. Max .2 m305 mm 610 mm 914 mm 10 ft Top Vent Horizontal Termination Two ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield Appliance Preparation Removing Non-combustible Facing Mate- rial AssemblyProvided to secure the appliance to the framing members Diagram shows .2 the location of the nailing tabsSecuring and Leveling the Appliance Complete Installation of Non-combustible Facing Material Installing Flue RestrictorsAssembling Pipe Sections Installing Vent PipeAssembly of Vent Sections Attaching Vent to the Firebox AssemblyAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsHorizontal Sections Disassembly of Vent SectionsSecuring the Vent Sections Vertical SectionsHeat shield DVP-HSM-B must be used Installing Heat Shield and Horizontal Termination CapInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal Terminationflue of the pipe see Figure Installing Roof Flashing and Vertical Ter- mination Cap18 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Optional Accessories Requirements Recommendation for WireIntellifire Ignition System Wiring Connecting to the ApplianceProperly grounded Not operate unlessJunction Box Detail Junction Box InstallationStep Finishing Non-combustible Facing Material Facing MaterialMounting stone eye brow ATRIMSTONE-36, ATRIMSTONE-42 Finishing Material OptionsFinishing Material Thickness from 3/4 in. to 1-1/4 Finishing Material Thickness greater than 1-1/4 inch10 Fireplace sitting on combustible surface Ember Placement Appliance SetupClean the Appliance AccessoriesPositioning the Logs Model Cerona-36 Log Assembly LOGS-Cerona36Heat & Glo Cerona-36, Cerona-42 2106-900 Rev. F 04/08 Model Cerona-42 Step Grilles and Trim Glass AssemblyAir Shutter Setting This appliance has an Intellifire ignition system Operating InstructionsBefore Lighting Appliance Final inspection by Lighting Appliance IPI IgnitionAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Sympton Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Symptom Possible Cause Corrective Action Maintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksModel Cerona-36 Model Cerona-42 Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP-TRAP COOL-ADD Not for use with these models Part number list on following Log Set AssemblyService Parts At Depot Service Parts ListStocked IPI Valve AssemblyCERONA-42 Fan Kit GFK-160A Junction Box 4021-013 Box Paint Kit CERONA-42IPI Valve Assembly Limited Lifetime Warranty Heat & GLO GAS Appliance Products Limited Lifetime WarrantyContact Information
Related manuals
Manual 62 pages 22.54 Kb Manual 1 pages 2.44 Kb