Heat & Glo LifeStyle BE-41LPC, BE-41C Termination Locations, Vent Termination Minimum Clearances

Page 22

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12...........................................................1.0*

Over 6/12 to 7/12.................................................1.25*

Over 7/12 to 8/12.................................................1.5*

Over 8/12 to 9/12.................................................2.0*

Over 9/12 to 10/12...............................................2.5

Over 10/12 to 11/12 .............................................3.25

Over 11/12 to 12/12 .............................................4.0

Over 12/12 to 14/12.............................................5.0

Over 14/12 to 16/12.............................................6.0

Over 16/12 to 18/12.............................................7.0

Over 18/12 to 20/12.............................................7.5

Over 20/12 to 21/12.............................................8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge

Opening

 

 

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A*

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood terminations, the wood termination cap must be higher than the gas termination cap.

Figure 6.2 Staggered Termination Caps

22

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

Image 22
Contents What to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byFor Your Safety Read Before Lighting Lighting Instructions Lighting Instructions Standing PilotFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesCombustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTwo Elbows Vent Diagrams Top Vent Horizontal TerminationOne Elbow V1 Minimum H1 MaximumTop Vent Horizontal Termination Three Elbows Min MaxBreak Here Top Vent Vertical Termination Maximum + V 2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow H1 + H2 Maximum V1 MinimumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Ansi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination Cap DVP and SLP PipeRefer to of this manual Gas Pressure Gas InformationFuel Conversion Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntelliFire Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair IntelliFire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoors Finish Door FIT Material See Maximum ThicknessAppliance Setup LOG Assembly LOGS-6000BE Install the Log AssemblyLog Placement Tabs Air Shutter Settings Install Trim and/or SurroundAir Shutter Setting BurnerSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHorizontal Termination Cap DVP vent components302 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Horizontal Pipe Support 165 mm 222 mm 168 mmElbow Effective Height Length 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 ElbowSupport Box-Black Termination Cap Cathedral CeilingSnorkel Ceiling FirestopContact Information