Heat & Glo LifeStyle BE-41IPILPC, BE-41C Framing and Clearances, Selecting Appliance Location

Page 19

5 Framing and Clearances

A. Selecting Appliance Location

When selecting a location for the appliance it is important to consider the required clearances to walls (see Figure 5.1).

WARNING! Risk of Fire or Burns! Provide adequate clearance around air openings and for service access.

Due to high temperatures, the appliance should be locat- ed out of traffic and away from furniture and draperies.

NOTICE: Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY. Illustrations/diagrams are not drawn to scale. Actual installation may vary due to individual design preference.

G

1/2 IN.

A

D

H

A

B C

TOP VENT

ONE 90º ELBOW

REAR VENT,

HORIZONTAL TERMINATION,

TWO ELBOWS

B

D

B

ALCOVE

INSTALLATION E

 

REAR VENT,

 

REAR VENT,

ONE ELBOW

 

B

 

NO ELBOWS

D

 

B

 

F

D

 

A

B

C

D

E

F

G

H

Inches

51

42

72

56-5/8

See Section D.

22

17-3/4

8

Millimeters

1295

1067

1829

1438

Mantel Projections

559

451

203

Figure 5.1 Appliance Locations

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

19

Image 19
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPILighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Ansi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination Cap DVP and SLP PipeRefer to of this manual Gas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Ignition System Wiring Standing Pilot Ignition System WiringIntelliFire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Install the Log Assembly LOG Assembly LOGS-6000BELog Placement Tabs Burner Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 Elbow 165 mm 222 mm 168 mmElbow Effective Height Length Horizontal Pipe SupportCeiling Firestop Cathedral CeilingSnorkel Support Box-Black Termination CapContact Information