Heat & Glo LifeStyle BE-41IPIC, BE-41C, BE-41LPC Getting Started, Typical Appliance System

Page 17

4

Getting Started

Installer Guide

 

 

 

A. Typical Appliance System

NOTICE: Illustrations and photos reflect typical installations and are for design purposes only. Illustrations/diagrams are not drawn to scale. Actual product may vary from pictures in manual

Note: Dual venting configurations ARE NOT allowed. Appliance MUST be vented EITHER vertically OR horizontally.

NON-COMBUSTIBLE ROOF FLASHING

MAINTAINS MINIMUM CLEARANCE

AROUND PIPE (SECTION 10.G)

VENT PIPE (SECTIONS 7 and 8)

CEILING FIRESTOP ON FLOOR OF ATTIC (SECTION 8.C)

VERTICAL TERMINATION CAP (SECTION 10.J)

STORM COLLAR (SECTION 10.H)

VENT PIPE PENETRATES ROOF PREFERABLY WITHOUT AFFECTING ROOF RAFTERS (SECTION 8.C)

ATTIC INSULATION SHIELD (NOT SHOWN) MUST BE USED HERE TO KEEP INSULATION AWAY FROM VENT PIPE IF ATTIC IS INSULATED (SECTION 8.D)

HORIZONTAL

TERMINATION CAP (SECTION 10.M )

FRAMING/HEADER (SECTION 5.B)

FRAMING HEADED OFF IN CEILING JOISTS (SECTION 8.C)

OPTIONAL

WALL SWITCH

MANTEL AND MANTEL LEG (SECTION 5.D)

SURROUND

HEARTH EXTENSION

GAS LINE (SECTION 11)

Figure 4.1 Typical System

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

17

Image 17
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceOn position. The ON/OFF switch may Turn off all electric power to the applianceLighting Instructions IPI Final inspection byLighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent Diagrams Top Vent Horizontal TerminationTwo Elbows V1 Minimum H1 MaximumMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsIntelliFire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Install the Log Assembly LOG Assembly LOGS-6000BELog Placement Tabs Air Shutter Setting Install Trim and/or SurroundAir Shutter Settings BurnerStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination CapRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Elbow Effective Height Length 165 mm 222 mm 168 mmHorizontal Pipe Support 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 ElbowSnorkel Cathedral CeilingSupport Box-Black Termination Cap Ceiling FirestopContact Information