Heat & Glo LifeStyle BE-41IPILPC, BE-41C, BE-41IPIC Install the Ceiling Firestop, Pipe DVP SLP

Page 35

C. Install the Ceiling Firestop

A ceiling firestop MUST be used between floors and attics.

DVP pipe only - Frame an opening 10 in. by 10 in. (254 mm by 254 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

SLP pipe only - Frame opening 9 in. x 9 in. (229 mm x 229 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

Frame the area with the same sized lumber as used in ceiling/floor joist.

The ceiling firestop may be installed above or below the ceiling joists when installed with a attic insulation shield. It must be under joists between floors that are not insulated. Refer to Figure 8.4.

Secure with three fasteners on each side.

WARNING! Risk of Fire! DO NOT pack insu- lation around the vent. Insulation must be kept back from the pipe to prevent overheating.

 

 

ATTIC ABOVE

 

 

A

 

 

A

 

PIPE

A

 

DVP

10 in. (254 mm)

 

SLP

9 in. (229 mm)

Figure 8.3

Installing Ceiling Firestop

 

 

INSTALL ATTIC INSULATION SHIELDS

 

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

 

3 FASTENERS

 

 

PER SIDE

 

 

CEILING FIRESTOP

CEILING FIRESTOP

 

INSTALLED BELOW CEILING

INSTALLED ABOVE CEILING

Figure 8.4 Installing the Attic Shield

 

Heat & Glo • BE-41C / LP,

BE-41IPIC / LP • 2105-900 Rev. P • 6/09

35

Image 35
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPILighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Ignition System Wiring Standing Pilot Ignition System WiringIntelliFire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Install the Log Assembly LOG Assembly LOGS-6000BELog Placement Tabs Burner Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 Elbow 165 mm 222 mm 168 mmElbow Effective Height Length Horizontal Pipe SupportCeiling Firestop Cathedral CeilingSnorkel Support Box-Black Termination CapContact Information