Heat & Glo LifeStyle BE-41LPC, BE-41C, BE-41IPIC, BE-41IPILPC owner manual Junction Box Installation

Page 50

F. Junction Box Installation

If the box is being wired from the INSIDE of the appli- ance:

Remove the screw attaching the junction box/receptacle to the outer shell, rotate the junction box inward to dis- engage it from the outer shell (see Figure 12.4).

Pull the electrical wires from outside the appliance through the opening into the valve compartment and secure wires with a Romex connector. See Figure 12.4.

Make all necessary wire connections to the junction box/receptacle and reattach the junction box/receptacle to the outer shell.

G. Wall Switch Installation for Fan (Optional)

If the box is being wired to a wall mounted switch for use with a fan (See Figure 12.5):

The power supply for the appliance must be brought into a switch box.

The power can then be supplied from the switch box to the appliance using a minimum of 14-3 with ground wire.

At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown.

At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown.

Add a 1/4 in. insulated female connector to the red (switch leg) wire, route it through the knockout in the face of the junction box, and connect to the top fan switch connector (1/4 in. male) as shown.

 

Romex

 

Connector

 

14/2WG

 

Cover Plate

 

outside firebox

WHT

 

BLK

 

WHT

 

BLK

Copper

 

GRN wire

ground attached

to GRN screw with

inside box

 

GRN wire

NOTICE: DO NOT wire

110 VAC to wall switch.

Figure 12.4 Junction Box Detail

 

Minimum 14-3 AWG

 

Switch

 

 

with Ground

 

 

 

Red

 

 

Black

Black

 

White

White

Junction Box

Green

Green

Red Black White Green

 

Power

 

Switch Box

 

Supply

 

 

 

 

Wires

 

Knockout

 

Red

 

 

Figure 12.5 Junction Box Wired to Wall Switch or BC10

50

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

Image 50
Contents What to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Turn off all electric power to the applianceOn position. The ON/OFF switch may Final inspection byFor Your Safety Read Before Lighting Lighting Instructions Lighting Instructions Standing PilotFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTwo Elbows Vent Diagrams Top Vent Horizontal TerminationOne Elbow V1 Minimum H1 MaximumTop Vent Horizontal Termination Three Elbows Min MaxBreak Here Top Vent Vertical Termination Maximum + V 2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow H1 + H2 Maximum V1 MinimumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Pressure Gas InformationFuel Conversion Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntelliFire Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair IntelliFire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoors Finish Door FIT Material See Maximum ThicknessAppliance Setup LOG Assembly LOGS-6000BE Install the Log AssemblyLog Placement Tabs Air Shutter Settings Install Trim and/or SurroundAir Shutter Setting BurnerStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Ignition System Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsHorizontal Termination Cap DVP vent components302 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Horizontal Pipe Support 165 mm 222 mm 168 mmElbow Effective Height Length 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 ElbowSupport Box-Black Termination Cap Cathedral CeilingSnorkel Ceiling FirestopContact Information