B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8in.

(203 mm)

Heat

Shield

15-1/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(384 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Term Cap

Minimum

Maximum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Effective Length

Effective Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12 in.

 

 

 

 

Max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3-1/8 in.

4-5/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

(305 mm)

 

Effective

Trap1

 

 

 

 

 

 

 

 

79 mm

117 mm

 

 

 

 

 

DVP-TRAP

Length

 

 

 

 

 

 

 

 

 

 

Trap2

5-3/8 in.

9-3/8 in.

 

 

Horizontal Termination Cap

 

 

 

 

 

 

 

 

 

 

 

 

137 mm

238 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DVP-TRAP1

DVP-TRAP2

DVP-TRAPK1

DVP-TRAPK2

DVP-HPC1

DVP-HPC2

Figure 16.3 DVP vent components

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

63

Image 63
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPILighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Gas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Ignition System Wiring Standing Pilot Ignition System WiringIntelliFire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Install the Log Assembly LOG Assembly LOGS-6000BELog Placement Tabs Burner Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Causes Corrective ActionStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 Elbow 165 mm 222 mm 168 mmElbow Effective Height Length Horizontal Pipe SupportCeiling Firestop Cathedral CeilingSnorkel Support Box-Black Termination CapContact Information