Heat & Glo LifeStyle BE-41IPILPC, BE-41C, BE-41IPIC, BE-41LPC Covered Alcove Applications

Page 23

 

 

 

E

 

 

 

 

C

 

 

A

 

F

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

J

B

 

 

 

U.S

 

 

 

 

 

 

 

 

 

V

V

B

 

 

 

 

B

(3 FT.)

 

 

 

 

V

 

 

 

 

 

i

 

 

 

 

 

 

 

 

 

 

 

 

D

V

V

 

G

M

X

 

 

 

A

 

 

V

 

 

 

 

 

 

 

H or i

 

 

O

 

 

 

V

 

 

 

N

 

 

 

 

 

 

 

 

 

 

P

 

L

 

 

R

 

 

 

V

K

Electrical

K

V

 

 

 

 

Service

 

 

 

 

 

 

 

 

 

C

Q

V

(See Note 2)

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

 

V

= VENT TERMINAL

X = AIR SUPPLY INLET

A

=

12 inches

clearances above grade, veranda,

 

 

 

(See Note 1)

porch, deck or balcony

B

=

12 inches

clearances to window or door

 

 

 

 

that may be opened, or to perma-

 

 

 

 

nently closed window. (Glass)

C

=

18 inches

vertical clearance to unventilated

 

 

 

 

soffit or to ventilated soffit located

 

 

 

 

above the terminal

 

 

 

30 inches

for vinyl clad soffits and below

 

 

 

 

electrical service

D

=

9 inches

clearance to outside corner

E

=

6 inches

clearance to inside corner

F

=

3 ft. (Canada)

not to be installed above a gas

 

 

 

 

meter/regulator assembly within 3

 

 

 

 

feet (90 cm) horizontally from the

 

 

 

 

center-line of the regulator

G

=

3 ft

clearance to gas service regulator

H

=

9 inches (U.S.A.)

vent outlet

 

 

 

 

12 inches (Canada) clearance to non-mechanical

 

 

 

(See Note 2)

air supply inlet to building or the

 

 

 

 

combustion air inlet to any other

i

=

3 ft. (U.S.A.)

appliance

 

 

 

 

6 ft. (Canada)

clearance to a mechanical (pow-

 

 

 

(See Note 2)

ered) air supply inlet

**a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

***only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

Note 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page)

Note 2: Termination in a covered alcove space (spaces open only on one

side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.

Figure 6.3 Minimum Clearances for Termination

= AREA WHERE TERMINAL IS NOT PERMITTED

J**

=

7 ft

clearance above paved

 

 

(See Note 1)

sidewalk or a paved driveway

 

 

 

located on public property

K

=

6 inches

clearance from sides of electri-

 

 

(See Note 5)

cal service

L

=

12 inches

clearance above electrical

 

 

(See Note 5)

service

Covered Alcove Applications

M*** =

18 inches

clearance under veranda, porch,

 

 

 

 

deck, balcony or overhang

 

 

42 inches

......... vinyl

 

 

N

=

6 inches

non-vinyl sidewalls

 

 

12 inches

......... vinyl sidewalls

O

=

18 inches

......... non-vinyl soffit and overhang

 

 

42 inches

......... vinyl soffit and overhang

P

=

8 ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

RMAX

 

 

1 cap

 

3 feet

2 x Q ACTUAL

 

 

2 caps

 

6 feet

1 x Q ACTUAL

 

 

3 caps

 

9 feet

2/3 x Q ACTUAL

 

 

4 caps

 

12 feet

1/2 x Q ACTUAL

 

 

 

 

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

Note 3: Local codes or regulations may require different clearances.

Note 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

Note 5: Location of the vent termination must not interfere with access to the electrical service.

In the U.S and Canada: Vent system termination is NOT permitted in screened porches.

Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.

Heat & Glo assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.

Heat & Glo • BE-41C / LP, BE-41IPIC / LP • 2105-900 Rev. P • 6/09

23

Image 23
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPILighting Instructions Standing Pilot For Your Safety Read Before Lighting Lighting InstructionsAfter Fireplace is Lit Frequently Asked QuestionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationOne Elbow Two ElbowsMin Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsHeat & Glo BE-41C / LP, BE-41IPIC / LP 2105-900 Rev. P 6/09 H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsIntelliFire Ignition System Wiring Standing Pilot Ignition System WiringIntelliFire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Install the Log Assembly LOG Assembly LOGS-6000BELog Placement Tabs Burner Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 2 in mm 152 mm 8 in mm 251 mm SLP-90ST 90 Elbow 165 mm 222 mm 168 mmElbow Effective Height Length Horizontal Pipe SupportCeiling Firestop Cathedral CeilingSnorkel Support Box-Black Termination CapContact Information