Heat & Glo LifeStyle ST-36TRB-IPI owner manual RCOR-36TRB-IPI

Page 20

AE

I

H

C

 

B

G

 

D

I

F

 

A

 

B

C

D

E

F

G

H

I

 

DVP Pipe

 

SLP Pipe

Rough

DVP Pipe*

Rough

 

 

 

 

 

PIER-36TRB-IPI

 

 

 

 

Clearance

Combustible

Combustible

Ends of

Sides of

Rough

 

Rough

Rough

 

 

Opening

Opening

to Ceiling

Floor

Flooring

Appliance

Appliance

 

Opening

 

Opening

Opening

 

 

(Height)

(Width)

 

 

 

 

 

 

(Width)

 

(Width)

 

(Depth)

 

 

 

 

 

 

Inches

10

 

8-5/8

38-1/8

23

40

31-5/8

0

0

1/2

36

Millimeters

254

 

219

968

584

1016

803

0

0

13

914

* Adjust framing dimensions for interior sheathing (such as sheetrock)

Figure 5.3 Clearances to Combustibles PIER-36TRB-IPI

A

C

B

D

E

H

I

G

I

F

H

 

A

 

B

C

D

E

F

G

H

I

RCOR-36TRB-IPI

DVP Pipe

 

SLP Pipe

Rough

DVP Pipe*

Rough

 

 

 

 

 

 

 

 

 

Clearance

Combustible

Combustible

Ends of

Sides of

LCOR-36TRB-IPI

Rough

 

Rough

Opening

Rough

Opening

 

to Ceiling

Floor

Flooring

Appliance

Appliance

Opening

 

Opening

Opening

 

 

(Height)

(Width)

 

 

 

 

 

 

(Width)

 

(Width)

 

(Depth)

 

 

 

 

 

 

Inches

10

 

8-5/8

38-1/8

24

40

31-5/8

0

0

1/2

36

Millimeters

254

 

219

968

610

1016

803

0

0

13

914

* Adjust framing dimensions for interior sheathing (such as sheetrock)

Figure 5.4 Clearances to Combustibles LCOR-36TRB-IPI and RCOR-36TRB-IPI

20

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 20
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Blower Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Blower Kit optionalLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI Mantel and Wall Projections See-Through Combustible Mantel PIER/LCOR/RCOR Combustible MantelSee-Through Non-Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Gas, Wood or Fuel Oil Termination Cap Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams To SLP series vent pipe, if desiredTop Vent-Horizontal Termination-Two 45 Elbows Elbow on rear vent appliancesTop Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum305 mm Top Vent Horizontal Termination Three Elbows152 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ftTwo Elbows Three Elbows Maximum + V 2 Minimum12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2 Maximum H1+ H2 Maximum Rear Vent Vertical Termination One Elbow V1 Minimum H1 MaximumV1+ H1 = 40 ft 12.2 m Maximum Minimum + H 2 MaximumV1 Minimum H1+ H2+ H3 Maximum Rear Vent Vertical Termination Three ElbowsH1 Maximum V1 Minimum H1+ H2 Maximum Continue Adding Vent Components Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Proceed to . C Appliance PreparationTop Vent Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalSplatter Guard To install the Splatter GuardFinishing To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionStop finishing material flush with opening Facing MaterialFinishing Material Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Air Shutter Settings Install Trim Kits and SurroundsAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action flame rectification has Location Inches Millimeters Appliance Dimension DiagramReference Materials Electrical Access GAS Line Left View Front View Right View Pier DimensionsLeft View Front View Electrical Access GAS Line Right View 40-1/224-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV Optional Wire Harness Power Vent InlinePVI-SLP SLP-LPCElbow Ceiling FirestopSupport SLP-WSSLP-DCF-BK SLP-SNKD SLP-CCS-BKDVP-FBHT Service Parts Log Set AssemblyAt Depot See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information