Heat & Glo LifeStyle ST-36TRB-IPI owner manual Table of Contents, User Guide

Page 3

Safety Alert Key:

DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.

WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.

CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.

NOTICE: Used to address practices not related to personal injury.

Table of Contents

A. Congratulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 B. Limited Lifetime Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . 5

1 Listing and Code Approvals

A. Appliance Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 B. Tempered Glass Specifications . . . . . . . . . . . . . . . . . . . . . 7 C. BTU Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . . 7 E. Non-Combustible Materials Specification. . . . . . . . . . . . . . 7 F. Combustible Materials Specification . . . . . . . . . . . . . . . . . 7 G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 H. Requirements for the Commonwealth of Massachusetts. . 8

User Guide

2 Operating Instructions

A. Gas Fireplace Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 B. Your Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 C. Blower Kit (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 D. Clear Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 E. Decorative Doors and Fronts . . . . . . . . . . . . . . . . . . . . . . 10 F. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 G. Remote Controls, Wall Controls and Wall Switches. . . . . 10 H. Before Lighting Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . 10 I. Lighting Instructions (IPI) . . . . . . . . . . . . . . . . . . . . . . . . . 11 J. After Fireplace is Lit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 K. Frequently Asked Questions . . . . . . . . . . . . . . . . . . . . . . 12

3 Maintenance and Service

A. Maintenance Tasks-Homeowner . . . . . . . . . . . . . . . . . . . 13 B. Maintenance Tasks-Qualified Service Technician . . . . . . 14

Installer Guide

4 Getting Started

A. Typical Appliance System. . . . . . . . . . . . . . . . . . . . . . . . . 16

B. Design and Installation Considerations . . . . . . . . . . . . . . 17

C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . 17

D. Inspect Appliance and Components. . . . . . . . . . . . . . . . . 17

5 Framing and Clearances

A. Selecting Appliance Location . . . . . . . . . . . . . . . . . . . . . . 18

B. Constructing the Appliance Chase . . . . . . . . . . . . . . . . . . 19

C. Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

D. Mantel and Wall Projections. . . . . . . . . . . . . . . . . . . . . . . 21

6 Termination Locations

A. Vent Termination Minimum Clearances . . . . . . . . . . . . . . 23

7 Vent Information and Diagrams

A. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

B. Vent Table Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

C. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

D. Measuring Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

E. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . . 36 B. Continue Adding Vent Components . . . . . . . . . . . . . . . . . 36 C. Wall Penetration Framing. . . . . . . . . . . . . . . . . . . . . . . . . 37 D. Vertical Penetration Framing . . . . . . . . . . . . . . . . . . . . . . 38 E. Install Attic Insulation Shield. . . . . . . . . . . . . . . . . . . . . . . 39

9 Appliance Preparation

A. Top Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

B. Rear Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

C. Securing and Leveling the Appliance . . . . . . . . . . . . . . . . 42

10 Installing Vent Pipe (DVP and SLP Pipe)

A. Assemble Vent Sections (DVP Pipe Only) . . . . . . . . . . . . 43 B. Assemble Vent Sections (SLP Pipe Only) . . . . . . . . . . . . 44 C. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 44 D. Secure the Vent Sections. . . . . . . . . . . . . . . . . . . . . . . . . 45 E. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . 45 F. Install Decorative Ceiling Components (SLP only). . . . . . 46 G. Install Metal Roof Flashing . . . . . . . . . . . . . . . . . . . . . . . . 47 H. Assemble and Install Storm Collar . . . . . . . . . . . . . . . . . . 47 I. Install Vertical Termination Cap . . . . . . . . . . . . . . . . . . . . 48 J. Install Decorative Wall Components (SLP only). . . . . . . . 48 K. Heat Shield Requirements for Horizontal Termination . . . 48 L. Install Horizontal Termination Cap (DVP and SLP Pipe) . 49

11 Gas Information

A. Fuel Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . 50

12 Electrical Information

A. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 B. Intellifire Ignition System Wiring . . . . . . . . . . . . . . . . . . . . 51 C. Optional Accessories Requirements . . . . . . . . . . . . . . . . 51 D. Electrical Service and Repair . . . . . . . . . . . . . . . . . . . . . . 51 E. Junction Box Installation. . . . . . . . . . . . . . . . . . . . . . . . . . 53 F. Wall Switch Installation for Fan (Optional) . . . . . . . . . . . . 53

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

3

Image 3
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Blower Kit optional Blower InstallationFixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseRCOR-36TRB-IPI PIER/LCOR/RCOR Non-Combustible Mantel Mantel and Wall Projections See-Through Combustible MantelPIER/LCOR/RCOR Combustible Mantel See-Through Non-Combustible MantelTOP View Termination Locations Vent Termination Minimum ClearancesGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyElbow on rear vent appliances Vent DiagramsTo SLP series vent pipe, if desired Top Vent-Horizontal Termination-Two 45 ElbowsV1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 MaximumTop Vent Horizontal Termination Three Elbows 152 mm305 mm Exhaust restrictor Instructions 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ft Break HereH1+ H2 V1 + V2 Minimum H1+ H2 Maximum Two Elbows Three ElbowsMaximum + V 2 Minimum 12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H2 Maximum H1+ H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Minimum + H 2 Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum V1+ H1 = 40 ft 12.2 m MaximumRear Vent Vertical Termination Three Elbows H1 Maximum V1 Minimum H1+ H2 MaximumV1 Minimum H1+ H2+ H3 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesContinue Adding Vent Components Correct Wall Penetration FramingCombustible Wall Penetration Non-Combustible Wall PenetrationPipe DVP SLP Vertical Penetration FramingInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentProceed to . C Cut the metal retaining band Rear VentAttach Nailing Tab to Front Corner of Unit Securing and Leveling the ApplianceAssemble Pipe Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingImportant Notice Heat shields may not be field constructed Install Vertical Termination CapInstall Decorative Wall Components SLP only Heat Shield Requirements for Horizontal TerminationDVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureWiring Requirements Optional Accessories RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelPIER/LCOR/RCOR Mantel Projection Mantel and Wall Projections See-Through Mantel ProjectionFacing Material Finishing MaterialStop finishing material flush with opening Finishing material between 1 and 2 inches thick Finishing materials over 1 inch thickElevated Hearth Systems Appliance Setup 2128-935 Install the Log AssemblyIndentations Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame rectification has Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Pier Dimensions Electrical Access GAS Line Left View Front View Right View33-1/2 Left View Front View Electrical Access GAS Line Right View40-1/2 24-1/2DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-TV SLP-LPC Optional Wire HarnessPower Vent Inline PVI-SLPSLP-WS ElbowCeiling Firestop SupportSLP-SNKD SLP-CCS-BK DVP-FBHTSLP-DCF-BK See Through Direct Vent Gas Fireplace Service PartsLog Set Assembly At DepotPier Direct Vent Fireplace PIER-36TRB-IPILeft Corner Direct Vent Fireplace LCOR-36TRB-IPIRight Corner Direct Vent Fireplace RCOR-36TRB-IPIStocked #15 Valve AssemblyLPK-DXV Service Parts ListContact Information