Heat & Glo LifeStyle ST-36TRB-IPI owner manual Service Parts, Log Set Assembly, At Depot

Page 76

C. Service Parts

ST-36TRB-IPI

 

 

 

 

36” See Through Direct Vent Gas Fireplace

Beginning Manufacturing Date: Nov. 2008

 

 

Ending Manufacturing Date:______

Log Set Assembly

 

 

 

 

 

4

 

 

 

1

5

 

B 3

 

 

 

 

C

 

 

D

2

 

A

 

 

 

 

 

 

 

 

6

 

 

 

 

8

 

 

 

 

7

 

 

 

 

10

12

 

 

 

11

 

 

 

 

9

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

 

Log Set Assembly

 

LOGS-2128

Y

A

Log A

 

SRV2128-701

 

B

Log B

 

SRV2128-702

 

C

Log C

 

SRV2128-703

 

D

Log D

 

SRV2128-706

 

1

Log 1

 

SRV2128-704

 

2

Log 2

 

SRV2128-705

 

3

Log 3

 

SRV2128-707

 

4

Sheetrock Ledge

 

2128-118

 

5

Refractory Left

 

2129-017

 

Refractory Right

 

2129-016

 

 

 

 

6

Burner NG, LP

 

2128-007

Y

7

Base Pan/Grate Assembly

 

2128-005

 

8

Glass Door Assembly

Qty 2 req

GLA-750TR

Y

9

Thermostat Wire

 

2118-170

Y

10

Pilot Shield

 

2128-124

 

11

Junction Box

 

4021-013

Y

12

Junction Box Bracket

 

2128-128

 

 

Surround Overlay (contains overlay for top, bottom and sides)

 

SRV2128-FACE

 

Additional service part numbers appear on following page.

76

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 76
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Blower Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Blower Kit optionalLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI Mantel and Wall Projections See-Through Combustible Mantel PIER/LCOR/RCOR Combustible MantelSee-Through Non-Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Vent Termination Minimum Clearances Termination LocationsGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams To SLP series vent pipe, if desiredTop Vent-Horizontal Termination-Two 45 Elbows Elbow on rear vent appliancesTop Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum152 mm Top Vent Horizontal Termination Three Elbows305 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ftTwo Elbows Three Elbows Maximum + V 2 Minimum12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage H1 Maximum V1 Minimum H2 Maximum H1+ H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Rear Vent Vertical Termination One Elbow V1 Minimum H1 MaximumV1+ H1 = 40 ft 12.2 m Maximum Minimum + H 2 MaximumH1 Maximum V1 Minimum H1+ H2 Maximum Rear Vent Vertical Termination Three ElbowsV1 Minimum H1+ H2+ H3 Maximum Pipe Clearances to Combustibles Vent Clearances and FramingContinue Adding Vent Components Wall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProceed to . C Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionFinishing Material Facing MaterialStop finishing material flush with opening Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System flame rectification has Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Electrical Access GAS Line Left View Front View Right View Pier DimensionsLeft View Front View Electrical Access GAS Line Right View 40-1/224-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV Optional Wire Harness Power Vent InlinePVI-SLP SLP-LPCElbow Ceiling FirestopSupport SLP-WSDVP-FBHT SLP-SNKD SLP-CCS-BKSLP-DCF-BK Service Parts Log Set AssemblyAt Depot See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information