Heat & Glo LifeStyle ST-36TRB-IPI owner manual Dvp-Tv

Page 72

B. Vent Components Diagrams (continued)

 

 

 

7-3/8 in.

 

 

 

 

 

 

(187 mm)

 

 

 

 

 

 

1-1/2 in.

 

 

 

 

 

 

(38 mm)

 

 

 

 

 

 

 

 

 

3-7/8 in.

 

 

 

 

17-3/4 in.

 

(98 mm)

 

 

 

14 in.

 

 

 

 

 

(451 mm)

 

 

 

 

 

(356 mm)

 

 

 

 

 

 

 

 

 

10-1/2 in.

 

 

 

 

 

 

(267 mm)

 

 

 

 

 

 

DVP-TV

 

 

12 in.

 

 

VerticalTermination Cap

 

 

 

 

 

 

 

 

(305 mm)

 

 

 

 

 

 

DVP-TB1

 

 

 

 

 

BasementVent Cap

 

 

 

 

 

9 in.

 

 

 

12 in.

 

2-3/4 in.

(229 mm)

12-1/2 in.

 

 

305 mm

 

 

(317 mm)

 

 

 

 

(70 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-1/4 in.

 

 

 

11-1/2 in.

 

(184 mm)

12-1/2 in.

 

 

(292 mm)

 

 

 

 

 

 

 

 

(318 mm)

 

 

12-1/4 in.

 

 

5-1/4 in.

 

 

 

(311 mm)

 

 

(133 mm)

 

 

 

 

 

 

 

 

 

16 in.

 

 

 

 

 

 

(406 mm)

 

 

 

DVP-TVHW

 

 

PVK-80

 

 

 

 

 

VerticalTermination Cap (Highwind)

 

 

(For use with IPI and DSI appliances only.)

 

 

 

 

 

 

 

 

 

 

 

 

7-1/4 in.

 

 

 

16-7/8 in.

14 in.

1 in.

(184 mm)

 

 

 

(25 mm)

 

 

 

 

(429 mm)

(356 mm)

 

 

 

 

12 in.

 

 

14 in.

 

 

 

(305 mm)

 

 

(356 mm)

 

 

12-1/8 in.

7-1/8 in.

 

 

 

 

 

(181 mm)

 

 

 

 

 

(314 mm)

 

 

3/8 in. (10 mm)

 

 

 

 

 

 

 

 

8-3/4 in.

 

 

1 in. (25 mm)

 

 

 

(222 mm)

 

 

7-3/4 to 10-3/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

(197 to 264 mm)

 

 

 

1-5/8 in.

 

 

 

 

 

 

(41 mm)

 

 

DVP-FBHT

 

 

 

 

 

 

 

 

 

DVP-HPC

 

 

FireBrickTermination Cap

 

 

 

High Performance Cap

 

 

 

 

Figure 16.7 DVP vent components

 

 

 

72

 

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 72
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Blower Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Blower Kit optionalLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI Mantel and Wall Projections See-Through Combustible Mantel PIER/LCOR/RCOR Combustible MantelSee-Through Non-Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Termination Locations Vent Termination Minimum ClearancesGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams To SLP series vent pipe, if desiredTop Vent-Horizontal Termination-Two 45 Elbows Elbow on rear vent appliancesTop Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows 152 mm305 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ftTwo Elbows Three Elbows Maximum + V 2 Minimum12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H2 Maximum H1+ H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Rear Vent Vertical Termination One Elbow V1 Minimum H1 MaximumV1+ H1 = 40 ft 12.2 m Maximum Minimum + H 2 MaximumRear Vent Vertical Termination Three Elbows H1 Maximum V1 Minimum H1+ H2 MaximumV1 Minimum H1+ H2+ H3 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesContinue Adding Vent Components Wall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentProceed to . C Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionFacing Material Finishing MaterialStop finishing material flush with opening Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame rectification has Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Electrical Access GAS Line Left View Front View Right View Pier DimensionsLeft View Front View Electrical Access GAS Line Right View 40-1/224-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV Optional Wire Harness Power Vent InlinePVI-SLP SLP-LPCElbow Ceiling FirestopSupport SLP-WSSLP-SNKD SLP-CCS-BK DVP-FBHTSLP-DCF-BK Service Parts Log Set AssemblyAt Depot See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information