Heat & Glo LifeStyle ST-36TRB-IPI owner manual Covered Alcove Applications

Page 24

C

V

J

B

 

 

 

B

 

 

V

B

 

V

 

D

 

V

 

V

A

F

G

M

V

H or i

X V H

V H V

E

V

A

O

N

P

R

Q

 

 

 

 

V

 

 

 

 

 

 

 

 

L

 

 

 

 

 

K

 

 

 

 

K

 

 

 

 

 

Electrical

 

 

 

V

 

 

 

 

V

 

 

 

 

 

 

V= VENT TERMINAL X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

12 inches

clearances above grade, veranda,

 

 

 

porch, deck or balcony

B

=

12 inches

clearance to window or door that may

 

 

 

be opened, or to permanently closed

 

 

 

window

C

=

18 inches

clearance below unventilated soffit

 

 

18 inches

clearance below ventilated soffit

 

 

30 inches

clearance below vinyl soffits and

 

 

 

electrical service

D

=

9 inches

clearance to outside corner

E

=

6 inches

clearance to inside corner

F

=

3 ft. (Canada)

not to be installed above a gas me-

 

 

 

ter/regulator assembly within 3 feet

 

 

 

horizontally from the center-line of the

 

 

 

regulator

G

=

3 ft

clearance to gas service regulator

 

 

 

vent outlet

H

=

9 inches (U.S.A)

 

12inches (Canada). clearance to non-mechanical (unpow- ered) air supply inlet, combustion air inlet or direct-vent termination

i= 3 ft. (U.S.A.)

6 ft. (Canada)

...........clearance to a mechanical (powered)

 

air supply inlet

All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below termination.

J

= 7 ft

On public property: clearance above

 

 

paved sidewalk or a paved driveway.

A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

K

=

6 inches

clearance from sides of electrical

 

 

 

service

L

=

12 inches

clearance above electrical service

Location of the vent termination must not interfere with access to the electrical service.

M = 18 inches

clearanceunderveranda,porch,deck,

 

balcony or overhang

42 inches

vinyl or composite overhang

Permitted when veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor.

Figure 6.3 Minimum Clearances for Termination

Service

C

V

Covered Alcove Applications

(Spaces open only on one side and with an overhang)

N= 6 inches ........... non-vinyl sidewalls 12 inches ......... vinyl sidewalls

O= 18 inches ......... non-vinyl soffit and overhang 42 inches ......... vinyl soffit and overhang

P= 8 ft.

 

QMIN

RMAX

1 cap

3 feet

2 x Q ACTUAL

2 caps

6 feet

1 x Q ACTUAL

3 caps

9 feet

2/3 x Q ACTUAL

4 caps

12 feet

1/2 x Q ACTUAL

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, traffic areas or where people may pass or gather (sidewalk, deck, patio, etc.). Listed cap shields available. Contact your dealer.

Local codes or regulations may require different clearances.

Vent system termination is NOT permitted in screened porches.

Vent system termination is permitted in porch areas with two or more sides open.

Hearth & Home Technologies assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

Vinyl protection kits are suggested for use with vinyl siding.

24

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 24
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Blower Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Blower Kit optionalLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI Mantel and Wall Projections See-Through Combustible Mantel PIER/LCOR/RCOR Combustible MantelSee-Through Non-Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Termination Locations Vent Termination Minimum ClearancesGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams To SLP series vent pipe, if desiredTop Vent-Horizontal Termination-Two 45 Elbows Elbow on rear vent appliancesTop Vent Horizontal Termination One Elbow Two ElbowsV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows 152 mm305 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ftTwo Elbows Three Elbows Maximum + V 2 Minimum12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H2 Maximum H1+ H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Rear Vent Vertical Termination One Elbow V1 Minimum H1 MaximumV1+ H1 = 40 ft 12.2 m Maximum Minimum + H 2 MaximumRear Vent Vertical Termination Three Elbows H1 Maximum V1 Minimum H1+ H2 MaximumV1 Minimum H1+ H2+ H3 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesContinue Adding Vent Components Wall Penetration Framing Combustible Wall PenetrationNon-Combustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentProceed to . C Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionFacing Material Finishing MaterialStop finishing material flush with opening Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame rectification has Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Electrical Access GAS Line Left View Front View Right View Pier DimensionsLeft View Front View Electrical Access GAS Line Right View 40-1/224-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV Optional Wire Harness Power Vent InlinePVI-SLP SLP-LPCElbow Ceiling FirestopSupport SLP-WSSLP-SNKD SLP-CCS-BK DVP-FBHTSLP-DCF-BK Service Parts Log Set AssemblyAt Depot See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information