E. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE

INSERT 3

SCREWS

BEND 3 TABS

OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

• Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Figure 8.8 Attic Insulation Shield

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

39

Image 39
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Blower Kit optional Blower InstallationFixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseRCOR-36TRB-IPI PIER/LCOR/RCOR Non-Combustible Mantel Mantel and Wall Projections See-Through Combustible MantelPIER/LCOR/RCOR Combustible Mantel See-Through Non-Combustible MantelTOP View Termination Locations Vent Termination Minimum ClearancesGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyElbow on rear vent appliances Vent DiagramsTo SLP series vent pipe, if desired Top Vent-Horizontal Termination-Two 45 ElbowsV1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 MaximumTop Vent Horizontal Termination Three Elbows 152 mm305 mm Exhaust restrictor Instructions 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ft Break HereH1+ H2 V1 + V2 Minimum H1+ H2 Maximum Two Elbows Three ElbowsMaximum + V 2 Minimum 12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H2 Maximum H1+ H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Minimum + H 2 Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum V1+ H1 = 40 ft 12.2 m MaximumRear Vent Vertical Termination Three Elbows H1 Maximum V1 Minimum H1+ H2 MaximumV1 Minimum H1+ H2+ H3 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesContinue Adding Vent Components Correct Wall Penetration FramingCombustible Wall Penetration Non-Combustible Wall PenetrationPipe DVP SLP Vertical Penetration FramingInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentProceed to . C Cut the metal retaining band Rear VentAttach Nailing Tab to Front Corner of Unit Securing and Leveling the ApplianceAssemble Pipe Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingImportant Notice Heat shields may not be field constructed Install Vertical Termination CapInstall Decorative Wall Components SLP only Heat Shield Requirements for Horizontal TerminationDVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureWiring Requirements Optional Accessories RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelPIER/LCOR/RCOR Mantel Projection Mantel and Wall Projections See-Through Mantel ProjectionFacing Material Finishing MaterialStop finishing material flush with opening Finishing material between 1 and 2 inches thick Finishing materials over 1 inch thickElevated Hearth Systems Appliance Setup 2128-935 Install the Log AssemblyIndentations Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame rectification has Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Pier Dimensions Electrical Access GAS Line Left View Front View Right View33-1/2 Left View Front View Electrical Access GAS Line Right View40-1/2 24-1/2DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-TV SLP-LPC Optional Wire HarnessPower Vent Inline PVI-SLPSLP-WS ElbowCeiling Firestop SupportSLP-SNKD SLP-CCS-BK DVP-FBHTSLP-DCF-BK See Through Direct Vent Gas Fireplace Service PartsLog Set Assembly At DepotPier Direct Vent Fireplace PIER-36TRB-IPILeft Corner Direct Vent Fireplace LCOR-36TRB-IPIRight Corner Direct Vent Fireplace RCOR-36TRB-IPIStocked #15 Valve AssemblyLPK-DXV Service Parts ListContact Information