Heat & Glo LifeStyle ST-36TRB-IPI owner manual TOP View

Page 22

TOP VIEW

1/2 in. Min.

FIREPLACE

OPENING

2-3/4 in. Min.

1 in.

 

Unlimited

 

 

 

 

Max.

 

 

3-1/4 in. Min.

Note: Clearance from opening to perpendicular wall.

Figure 5.9 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

SHEETROCK

3.5 in.

= AIR SPACE REQUIRED

Figure 5.10 Non-Combustible Zone (PIER and ST)

SHEETROCK

3.5 in.

= AIR SPACE REQUIRED

Figure 5.11 Non-Combustible Zone (LCOR and RCOR)

22

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 22
Contents HOT Surfaces What to do if you smell gasHot glass will cause burns Congratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Blower InstallationFixed Glass Assembly Blower Kit optionalWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI See-Through Non-Combustible Mantel Mantel and Wall Projections See-Through Combustible MantelPIER/LCOR/RCOR Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Vent Termination Minimum Clearances Termination LocationsGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTop Vent-Horizontal Termination-Two 45 Elbows Vent DiagramsTo SLP series vent pipe, if desired Elbow on rear vent appliancesV1 Minimum H1 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 + H2 Maximum152 mm Top Vent Horizontal Termination Three Elbows305 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ft12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum Two Elbows Three ElbowsMaximum + V 2 Minimum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage H1 Maximum V1 Minimum H2 Maximum H1+ H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 V1+ H1 = 40 ft 12.2 m Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum Minimum + H 2 MaximumH1 Maximum V1 Minimum H1+ H2 Maximum Rear Vent Vertical Termination Three ElbowsV1 Minimum H1+ H2+ H3 Maximum Pipe Clearances to Combustibles Vent Clearances and FramingContinue Adding Vent Components Non-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationProceed to . C Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionFinishing Material Facing MaterialStop finishing material flush with opening Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System flame rectification has Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Electrical Access GAS Line Left View Front View Right View Pier Dimensions24-1/2 Left View Front View Electrical Access GAS Line Right View40-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-TV PVI-SLP Optional Wire HarnessPower Vent Inline SLP-LPCSupport ElbowCeiling Firestop SLP-WSDVP-FBHT SLP-SNKD SLP-CCS-BKSLP-DCF-BK At Depot Service PartsLog Set Assembly See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information